My WebLink
|
Help
|
About
|
Sign Out
Home
2013_0211_packet amended
Roseville
>
City Council
>
City Council Meeting Packets
>
2013
>
2013_0211_packet amended
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2013 3:26:11 PM
Creation date
2/8/2013 11:57:38 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville 2012 ‐2016 Parks and Recreation Renewal Program <br /> Public engagement strategy 1 ‐17 ‐13 <br /> Page 4 <br /> <br />Engagement <br />format Inform Consult Collaborate <br />Engagement <br />purpose <br />To provide the public <br />with correct and timely <br />information regarding a <br />planned park <br />improvement <br />To assess a park and <br />evaluate potential <br />changes during a series <br />of meetings with both <br />interactive and passive <br />engagement activities <br />during each meeting <br />To more fully and <br />directly engage the <br />public, especially <br />neighbors and park <br />users and user groups, <br />in the planning and <br />design of a park <br />Anticipated <br />change in park <br />Reconstruction of a <br />park component in the <br />same or nearly the <br />same location without a <br />change in activity or <br />intensity of use <br />Significant <br />improvements in a park <br />(more than <br />replacement of park <br />components in the <br />same location) <br />Creation of new <br />facilities with more <br />broad influence on the <br />use and intensity of the <br />park; creation of a new <br />park or park facility <br />Project types Playground <br />replacement, court <br />replacement, field <br />improvements, <br />irrigation <br />improvements <br />Any park with a new <br />building; Oasis, <br />Rosebrook, Sandcastle <br />Improvement projects <br />with significant <br />complexity and <br />requiring public <br />contributions during <br />planning process; <br />Southwest Roseville <br />General meeting <br />description <br />One meeting, relatively <br />short in length (60 to 90 <br />minutes) <br />Three meetings, up to <br />two hours per meeting, <br />with two meetings <br />during concept <br />planning stage and one <br />during final design <br />One meeting up to <br />three hours to kick off <br />the concept planning <br />stage, followed by one <br />or two meetings up to <br />two hours each to <br />conclude the concept <br />planning stage, and one <br />meeting during final <br />design <br /> <br />“Inform” format: meetings with residents and stakeholders <br />Many improvements anticipated as part of the renewal program provide replacement or <br />upgrades to park components without changes in location of the component or in the intensity of <br />use. For these park improvements, providing information to the public and park stakeholders <br />during a single meeting (along with other notifications via media, email, web notices, or other <br />written communications) should suffice. This meeting might best occur in an open house format <br />using the following agenda as a guide: <br />Open House Meeting Agenda <br />Item Topic Description Time allowed
The URL can be used to link to this page
Your browser does not support the video tag.