Rj�kspa+_JL+ <br />Street Maintenance Project Summary <br />As part of the City of Roseville's ongoing street <br />maintenance program, streets which have curb and <br />gutter but have a poor driving surface are improved <br />using a mill and overlay process. This process <br />usually consists of grinding all or a portion of the <br />existing surface off the roadway and replacing it <br />with a new blacktop driving surface. As part of the <br />process, sunken or badly deteriorated curb and <br />gutter will be replaced. The following street <br />segments are included in this year's construction <br />contract: <br />• Commerce St (Snelling Svc Dr E to Albert St) <br />• Cope Ave (Grotto St to Dale St) <br />• Dellwood Ave (Co Rd B to Roselawn Ave) <br />• Eldridge Ave (Fry St (south) to Fry St (north)) <br />• Fry St (Co Rd B to Eldridge Ave) <br />• Eldridge Ave (Fry St (east) to Fry St (west)) <br />• Fry St (Eldridge Ave to Skillman Ave) <br />• Grandview Ave (Saint Albans St to Cul -de -sac) <br />• Iona Lane (Dale St to Western Ave) <br />• Lovell Ave (Grotto St to Dale St) <br />Milling of existing pavement on Centre Pointe Dr. <br />Attachment C <br />2013 Street Maintenance <br />Project <br />The cost to perform this pavement maintenance is <br />funded by existing City funds. There will be no <br />assessments for this work. <br />Once a street segment is started, Mill and Overlay <br />projects typically take between 3 to 5 weeks to <br />complete. <br />A schedule for this work is not available at this time. <br />We anticipate that this work will start in May. All <br />work should be completed by September. <br />Once a schedule is available we will send out <br />another newsletter and update the webpage. <br />Access <br />Contractors are required to keep the roads <br />passable and provide driveway access whenever <br />possible. The construction project will be staged so <br />that residents and emergency vehicles will be able <br />to drive on the streets at all times. If you have <br />special access needs, please let us know. <br />Don't see your street? <br />If your street is not on the list above, you are <br />receiving this newsletter because this project may <br />impact how you access your home. Private <br />driveway and sanitary sewer work is only <br />offered to property owners whose driveway or <br />sanitary sewer service is located on a street <br />being torn up. <br />Contacts: <br />Dean Findell, Project Coordinator <br />(651) 792 -7046 <br />dean.findell @ci.roseville.mn.us <br />Debra Bloom, City Engineer <br />(651) 792 -7042 <br />deb.bloom @ci.roseville.mn.us <br />Check for construction updates at: www. citvofroseville .com /streetmaintenance <br />