Laserfiche WebLink
Bituminous paving on Lydia Drive <br />Private Systems in the Right of Way <br />Curbs designated for repair will be marked in late <br />April. Private systems such as sprinklers or <br />invisible fences near curb repairs will be affected. <br />Please notify Dean Findell, Project Coordinator, <br />immediately if you have an underground sprinkler <br />system or invisible fence in the boulevard. He will <br />be able to determine if you need to move it out of <br />the way before construction starts. <br />Necessary removal and repairs are the <br />responsibility of the property owner. <br />Curb and Gutter <br />If there are curb and gutter repairs at your driveway <br />and /or concrete replacement on your driveway, <br />there will be a five -day period to harden or "cure" <br />the concrete. During that time, you will be able to <br />park in the street in front of your house. Curb and <br />driveway removals will be marked by the end of <br />April. <br />Mail Delivery & Garbage Pick up <br />The construction work should not impact your mail <br />delivery or garbage pickup. Schedules and times <br />should remain unchanged. <br />Survey Markers <br />In order to perform the project construction, <br />Engineers place a series of survey markers for the <br />Contractor to measure from. Typically these <br />markers are offset several feet from the object or <br />point they refer to so that they are not disturbed <br />during the construction process. As a result, these <br />offset markers are often placed well into resident's <br />yard. Please notify Dean Findell, Project <br />Coordinator, of any stakes that have been moved <br />accidently. <br />Sanitary Sewer Services <br />The maintenance of your sewer service from the <br />sewer main to your house is your responsibility. If <br />you have a history of back -ups or have to clean <br />your service frequently, it may be to your <br />advantage to get an estimate to replace your <br />service under the street at this time. Please contact <br />Dean Findell if you have questions. <br />Private Driveway Work: When your street is <br />reconstructed, certain private construction services <br />will be offered to you by the City's contractor. <br />These include: <br />• Widening your driveway. <br />• Replacing/ changing existing driveway pavement. <br />• Creating a curb cut in areas with drive -over curb. <br />The cost of this work would be funded 100% by the <br />property owner. If you are interested in these <br />services, please let us know. Once we have <br />awarded a contract for this work, we will request <br />that our contractor provide you with an estimate to <br />complete the requested work. We recommend that <br />you contact other driveway contractors to obtain <br />comparison quotes. <br />Utility Flags <br />To protect against underground utility damage, the <br />Contractor will be calling in utility locates. This is <br />required by anyone digging a hole whether it is for <br />planting a tree or removing curb. Xcel Energy, <br />Comcast and CenturyLink will locate their <br />underground utilities by spray painting and placing <br />flags in the boulevard. <br />Contact Us! <br />If you have any questions, concerns, or <br />comments please contact us at 651- 792 -7003 <br />between 8 am and 4:30 pm. <br />Throughout the project, we will keep you informed <br />through monthly direct mailings and weekly <br />updates on the project website. <br />If you would prefer to receive an electronic copy <br />of these newsletters instead of paper, please let <br />us know. <br />After Hours <br />If an issue arises outside of regular business <br />hours, contact the City's 24 -hour non - emergency <br />number at 651- 767 -0640. <br />ALWAYS CALL 911 FOR EMERGENCIES. <br />Check for construction updates at: www. citvofroseville .com /streetmaintenance <br />