Laserfiche WebLink
Private work- Sanitary Sewer & Driveways <br />We are no longer accepting requests for private <br />sanitary sewer or driveway work. <br />Private sanitary sewer work confirmations need to <br />be returned by May 3. <br />We have provided the Contractor the list of <br />driveway requests and they will provide you quotes <br />directly. We recommend that you contact other <br />driveway contractors for comparison quotes. <br />Project Description <br />As part of the City of Roseville's ongoing street <br />maintenance program, streets which have curb and <br />gutter but have a poor driving surface are improved <br />using a mill and overlay process. This process <br />usually consists of grinding all or a portion of the <br />existing surface off the roadway and replacing it <br />with a new blacktop driving surface. As part of the <br />process, sunken or badly deteriorated curb and <br />gutter is replaced. The following street segments <br />are included in this year's construction contract: <br />• Commerce St (250 ft east of Snelling Svc Dr E To <br />Albert St) <br />• Cope Ave (Grotto St To Dale St) <br />• Dellwood Street (Co Rd B To Roselawn Ave) <br />• Eldridge Ave (Fry St (East) To Fry St (West)) <br />• Fry St (Co Rd B To Eldridge Ave) <br />• Fry St (Eldridge Ave To Skillman Ave) <br />• Grandview Ave (Saint Albans St To Cul -De -Sac) <br />• Iona Lane (Dale St To Western Ave) <br />• Lovell Ave (Grotto St To Dale St) <br />The cost to perform this pavement maintenance is <br />funded by existing City funds. There will be no <br />assessments for this work. <br />Don't see your street? <br />If your street is not on the list above, you are <br />receiving this newsletter because this project will <br />impact how you access your home. <br />Safety <br />Your assistance in keeping the work zone safe is <br />important. The noise and dust created by <br />construction traffic make it difficult for workers to <br />watch onlookers. Heavy equipment operators must <br />concentrate on the job at hand and may not notice <br />children playing near or behind equipment. <br />Please remind children to stay clear of the <br />construction area and equipment both during <br />working and non - working hours. <br />Mail Delivery, Recycling, & Garbage Pick up <br />The construction work should not impact your mail <br />delivery, recycling or garbage pickup. Schedules <br />and times should remain unchanged. <br />Sanitary Sewer Lining <br />The Sanitary Sewer on many of the street <br />segments is being lined. A separate newsletter has <br />been sent to those properties affected by this <br />additional work. The contractor, SAK Construction, <br />is scheduled to begin lining the week of April 26. <br />This work will be completed ahead of the street <br />work. Affected properties will receive 24 hours <br />advance notice of them performing work on the <br />sewer that you are connected to. For updated <br />schedule information on this project, check the <br />project web page at: <br />www.citvofroseville.com/sewerlining <br />Project Contacts: <br />Dean Findell, Project Coordinator <br />(651) 792 -7046 <br />dean.findell(a�ci. roseville. mn. us <br />Deb Bloom, City Engineer <br />(651) 792 -7042 <br />deb.bloom anci.roseville.mn.us <br />Contact Us! <br />If you have any questions, concerns, or <br />comments please contact us at 651- 792 -7003 <br />between 8 am and 4:30 pm. <br />' Throughout the project, we will keep you informed <br />through monthly direct mailings and weekly <br />I updates on the project website. <br />If you would prefer to receive an electronic copy <br />of these newsletters instead of paper, please let <br />us know. <br />Notify Me list <br />+ To receive notifications of website updates and <br />other project related news, sign up for the Street <br />+ Maintenance Project "Notify Me" List at: <br />http://www.ci.roseville.mn.us/list.aspx <br />Signing up for this list does not automatically <br />remove you from our newsletter mailing list. <br />After Hours <br />If an issue arises outside of regular business <br />hours, contact the City's 24 -hour non - emergency <br />+ number at 651- 767 -0640. <br />ALWAYS CALL 911 FOR EMERGENCIES. <br />Check for construction updates at: www.citvofroseville .com /streetmaintenance <br />