Laserfiche WebLink
Trenchless technology <br />The technology that will be used on this project is a <br />spray -on liner produced by 3M. This product is <br />certified to the national standard of the National <br />Sanitation Foundation (NSF /ANSI — 61) for potable <br />water systems. NSF is an independent, not for <br />profit organization that certifies products that come <br />into contact with drinking water. The NSF has led <br />the development of the American National <br />Standards for all materials and products that treat <br />or come in contact with drinking water to help <br />protect public health and the environment and <br />minimize adverse health effects. <br />Municipal water is a heavily regulated market with a <br />well- defined set of requirements regarding public <br />health. All manufacturers are required to submit <br />their products to an authorized third party <br />laboratory to determine if the product is acceptable <br />for use. <br />Any product designed for use within a potable <br />drinking water system must be certified to the <br />ANSI/ NSF 61 Standard by an authorized review <br />firm. 3MTM ScotchkoteTM Pipe Renewal Liner 2400 <br />has been reviewed by two independent agencies, <br />NSF and Water Quality Authority (WQA) and 3M's <br />manufacturing process and facilities are reviewed <br />by NSF annually. <br />The materials used in the 3M liner are BPa and <br />Epoxy free, and contain no Volatile Organic <br />Compounds (VOCs) or solvent. <br />3M and Veit and Companies, Inc., the contractor for <br />this project, follow all local, State and Federal <br />safety regulations and procedures for construction <br />projects involving potable drinking water systems. <br />New to Minnesota <br />The 3M technology has been used in several other <br />states in the US as well as Canada and Europe. <br />However, this is the first project using this <br />technology in Minnesota. As a result, you may see <br />groups of people on site coming to look at the lining <br />process. These people will be engineers and public <br />works crews from other cities and public agencies, <br />city officials, and contractors interested in learning <br />about the process and product. <br />Traffic Delays <br />The Contractor will be responsible for traffic control <br />as part of the contract. All roadways will be open <br />throughout the project and we do not anticipate any <br />significant traffic delays. <br />Safety <br />We remind you to use caution around the work site. <br />Your assistance in reminding area children �r <br />to stay clear of construction equipment is 1' <br />helpful in maintaining a safe environment. <br />Your patience and cooperation during this_ <br />construction is appreciated. <br />Project Funding <br />The project will be funded with water infrastructure <br />funds, there will be no assessments to property <br />owners for this project. <br />Possible Schedule Changes <br />As with any construction project, the schedule and <br />completion date is somewhat dependent on the <br />weather. We ask for your patience with any <br />weather delays we may encounter during this <br />project. <br />cts: <br />istine Giga, P.E., Civil Engir <br />651.792.7048 <br />kristine.giga(c),ci. roseville.mn. us <br />Chad Carney, Sales and Marketing Manager, 3M <br />651.737.8408 <br />ccarnev(o).mmm.com <br />