Laserfiche WebLink
Contractor. The City does not regulate the day of the week Multiple <br />Family Dwellings shall receive service. Contractor shall inform the <br />City and each dwelling owner or manager the day and approximate <br />time the dwelling is scheduled to receive service. <br />Curbside Single Stream <br />Recycling carts shall be placed at curbside on collection day, placing <br />cart with the handle toward the house and the lid opening toward <br />street. The Contractor shall collect from each participation household <br />all acceptable materials that have been prepared according publicized <br />procedures. The Driver is required to place the emptied cart back <br />down in the same curbside location as set by the resident. In no case <br />is the cart to be left in the street. <br />Free walk-up service as specified in 4.44 shall be provided for all <br />customers who request it. <br />The Contractor must conduct at least once per quarter, or as agreed <br />upon by the City and the Contractor, curbside recycling cart checks. <br />Areas for cart checks must rotate between each recycling zone. The <br />Contractor shall audit the contents of carts from at least 25 <br />households and leave education tags if any Non-Targeted Materials <br />are found in the bins. A log shall be kept of all resident addresses <br />where education tags were left and the addresses shall be included in <br />the annual report to the City. <br />Organics <br />Roseville holds four Zero Waste events each year at which organic <br />material is collected for composting. Roseville staff and volunteers <br />monitor the collection stations during the events. Material collected <br />shall be shared with the Contractor for disposal at a permitted <br />organics composting facility. <br />Proposers are encouraged to address their potential for curbside <br />collection of organics. As part of its Solid Waste Master Plan, <br />Ramsey County is requiring cities offer residents the opportunity to <br />recycle organic materials by the end of 2016. <br />5.06. City Retains Right to Specify Resident Preparation Instructions <br />The Contractor shall agree that it is the City’s sole right to clearly <br />specify the resident sorting and setout requirements. Such <br />information shall be included in the annual public education flyer as <br />detailed in 4.05. <br />18 <br /> <br />