Laserfiche WebLink
3 <br />� <br />4 8.0 <br />8.1 <br />6 <br />7 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />IS <br />J\LQJti���/' <br />� ` ; / - -- <br />i limited to the Roseville Subdivision Regulations, the Roseville Zoning Regulations, and J <br />all other applicable environmental regulations. �� <br />SITE DEVELOPMENT REQUIREMENTS: <br />To ensure that the proposed development meets the CITY'S requii�ements and standards <br />for site development, the following provisions shall apply: <br />a. Final Grading Plan. The final grading plan for each phase must be reviewed and <br />approved by the Director of Public Works before any permits will be issued. All <br />grading shall comply with the approved grading plans and shall be the <br />responsibility of the COLLEGE. The COLLEGE's engineer shall provide to the <br />C[TY a letter certifying that the grading project was constructed in the manner <br />approved by the Director of Public Works or Designee prior to the issuance of a <br />Certificate of Occupancy. <br />16 b. Erosion Control. Prior to site grading for any phase, and before any utility <br />17 construction is commenced or building permits are issued, an erosion control plan <br />18 must be submitted for approval by the Director of Public Works and/or the Rice <br />19 Creek Watershed, and all erosion control actions shall be implemented, inspected <br />20 and approved by the CITY. <br />21 <br />22 c. Final Utility Servicing Plan. The final utility servicing plan for each phase must <br />23 be reviewed and approved by the Director of Public Works prior to any permits <br />24 being issued for the building. These plans shall include existing utility plans for <br />25 the full campus, showing all connections to the Roseville and Arden Hills public <br />26 systems. <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />d. Clean Up. The COLLEGE shall clean dirt and debris from public streets that has <br />resulted from construction work by said COLLEGE or COLLEGE'S <br />CONTRACTORS, its agents or assigns. The CITY will determine whether it is <br />necessary to take additional measures to clean dirt and debris from the streets. <br />After 24 hours verbal notice to the COLLEGE, the CITY may complete or <br />contract to coinplete the clean up at the COLLEGE'S expense. <br />35 e. Dtil[ty & Drainage Easements. The COLLEGE is responsible for creating, <br />36 dedicating and/or granting specific easements pertaining to public utility services <br />37 and/or storm water management measures as may be required by the City and/or <br />38 the Rice Creek Watershed. <br />39 <br />40 <br />41 <br />42 <br />43 <br />44 <br />45 <br />f. Roadway EasementlRight-of-Way: The COLLEGE is responsible for creating, <br />dedicating and/or granting specific roadway easements and/or right-of-way to the <br />City as described in the Traffic and Parking Mitigation section ofthis agreement. <br />4 <br />