-�..
<br />--•
<br />1 CITY may require compliance with any amendments to the City's Comprehensive Guide Plan,
<br />2 official controls, platting or dedication requirements enacted after the date of this Contract.
<br />3 4.0 Approval by the CITY
<br />+ In approving the final development plan for the PUD for the DEVELOPER, the CITY hereby
<br />5 incorporates the following exhibits. The DEVELOPER shall develop the subject property as
<br />6 described or shown in these exhibits. If the exhibits vary from the written terms of this Agreement,
<br />7 the written terms shall control. In the event the exhibits address items not specifically addressed in
<br />� this agreement, the exhibits shall govern with respect to those items. The e�ibits as approved by the
<br />9 City Council on July 12, 1999, or as amended thereafter, shall include:
<br />� C Exhibit A
<br />�i
<br />12 Exhibit B
<br />13
<br />Certificate of Survey indicating existing site conditions with all lot dimensions
<br />dated June 23, 1999.
<br />Topographic survey of the parcel indicating parcel elevations, structures, and
<br />other land features dated, February 10, 1999.
<br />14 Exhibit C Site development plan indication proposed structure, parking lot area, delivery
<br />� 5 lane, sidewalk, property lines, approved setbacks, and new Ramsey County right-
<br />16 of-way line dated, June 21, 1999.
<br />17 Exhibit D
<br />18
<br />19 Exhibit E
<br />20
<br />21 Exhibit F
<br />22
<br />23 Exhibit G
<br />24 Exhibit H
<br />25
<br />26 Exhibit I
<br />27 Exhibit J
<br />�8 Exhibit K
<br />29 Exhibit L
<br />30
<br />Grading/drainage plan indicating the structure additions and all grade contours
<br />with spot elevations, dated June 21, 1999.
<br />Utility plan indication sanitary sewer and watermain service, catch basins for
<br />surface water catchment, and existing utilities, dated June 21, 1999.
<br />Complete Landscape Plan with materials list, sizes, locations of all plant materials
<br />and proposed phasing schedule, dated June 22, 1999.
<br />Fence plan detailing proposed screen for north side of site, dated June 21, 1999.
<br />Site lighting plan indicating all types of lighting for the site and proposed
<br />structure dated June 21, 1999.
<br />Monument sign plan indicating approved sign location, dated June 21, 1999.
<br />Monument sign design and detail plan dated June 22, 1999.
<br />Floor plan indicating proposed interior structure layout, dated June 21, 1999
<br />Building elevation plan indication structure height, facade details and building
<br />materials dated June 15, 1999.
<br />3 � Exhibit M Proposed development schedule with installation dates of improvements,
<br />32 including anticipated beginning date, grading, footings, building construction,
<br />33 paving, landscaping, and anticipated occupancy date, dated June 22, 1999.
<br />Page 2 of 11
<br />
|