My WebLink
|
Help
|
About
|
Sign Out
Home
pf09-010
Roseville
>
Planning Files
>
2009
>
pf09-010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 3:32:19 PM
Creation date
6/24/2013 3:41:10 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
09-010
Planning Files - Type
Conditional Use Permit
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
651
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�.. <br />Mr. Kevin Kain - Bituminous Raadways Roseville Asphalt Plant <br />August 11, 2010 <br />Page 3 of 10 <br />.� <br />Specifiwlly, it would 6e helpful to see a maps or figures acwrately identifying where the residential, <br />commercial and industrial receptors are in the odor, notse and modeling analysis and in the Air <br />Fmissioru Risk Assessment (AFRAJ. <br />Gublic comments by Bitumfnous Roadways and information in tfle EAW indicate that crushing <br />operations wiil be limited to between 6 AM and 8 PM. Public documents contain referentes to <br />operations 6e[ween 7 AM ro 7 PM. Will other opera[ions also be iimited to this time period or will the <br />facility operate 24 hours per day? Likewise, Bituminous Roadways notes that its operations are seawnal <br />and not year round. The restrictions vn daily operations and annual operations have the effect of <br />concentroting emissions. The EAW states that the proposed facility is restricted to less than or equal to <br />589,231 tons of hot mix asphalt (NMA) on an annual basis. Whereas 589,231 tons per year spread over <br />8760 hours is 67.26 [ons per hour, using 16 hours per day from April through fJovem6er results ln an <br />average of 153.A5 tons per hour, This wncentretion of activity has over twice the hourly impact of the <br />scenarlo [hat assumes that there are not seasonal fluctuations. Was this considered in the EAW, the <br />AERA and the air permi[? Does the permit have limits on hovdy operatfons? <br />Newspaper reports on the recent public mee[ing state that the MPCq staff Indicated Chat Agency staff <br />wo�ld conduct inspectlons of the plant to ensure compliance with all set guidelines. How ohen will <br />MPCA staff be conduct(ng Inspect�ons? Will these inspections include inspections of hours of operation, <br />odors, noise, and other operatlonal permit [erms and conditions. What equipment will the MPCA utilize <br />to conduct these inspections? <br />Noise <br />The failure of the EAW to consider the actual uses of the property adjatent to and nearby the proposed <br />asphalt plant site has signiflcan[ impacts on the EAW noise analysis. The EAW estimates noise levels off <br />the projectsite at nearby "indusvfal properties" to be 72.5 tl8(A) which (s within [he MPCA standards <br />for industrial aceas. <br />We believe that the agency should use the commercial noise standard for adJacent property rother than <br />the Indus[rial s[andard: <br />Land Use Code <br />Residenlial NAC•1 <br />.__. __ _.__ .. <br />Commercial NAG2 <br />. <br />Industrial .NAC-3 <br />_....__..____._.'-----'--._--'----_._._.. ___ ._--.. __. . ..._ .._ _. �. <br />Minnesota PolWtion Control Agency <br />Stata Nolee Standards � <br />. . _.__..___. .. . _.._ .. .. _ .._ ___,._: <br />Day {7.00 a.m 10:00 p.m.) Night (10:00 p m. - 7:00 a.m.) <br />dBA dBA <br />._ ,.._. __.--.._. _._..._ _� <br />L'10 of 65 ; L50 of 60 ' L10 of 55 L50 0150 <br />- � - - - . .. ..._.. _. ��..._ . _._: <br />L10 of 70 ' L50 of 65 � � 1.10 0( 70 � L50 of 65 � <br />_... .. _ -- -- --_- -.._. . _ __ . ._.: <br />L1D oF 80 i L50 of 75 L10 of 80 ' L50 of �5 �� <br />The EAW Noise analysis uses test data from one crusher and the location of [hat crusher on the site is <br />uncleac From reading the EAW and the air permit, crushing may occur at any location on the proposed <br />1527 WFSTHRAKCH DRIVE • SUITE 200 • McLEAN, VA 22102 • TELEPHONE�7034878800 • FAX�903�28:�5801 <br />www gladslonmimmer6al mm I www,pladstonemmnanies mm <br />� <br />�..i <br />`r <br />
The URL can be used to link to this page
Your browser does not support the video tag.