Laserfiche WebLink
9.2 Based on the findings of Section 7 of this project report dated June 20, 2006,the City <br />Planner recommends approval of the request by LA Fitness for a CONDITIONAL USE <br />PERMIT allowing the redevelopment of former Mastell Brother's Trucking, 2420 <br />Cleveland Avenue, into a fitness center, subject to the following (amended/revised) <br />conditions: <br />A. The LA Fitness structure shall be limited to a dimensional footprint not to exceed <br />55,000 sq. ft., including a 5,000 sq. ft. mezzanine (as depicted on the plans dated <br />May 30, 2006). <br />B. The height of the structure shall be limited to 45 feet at the entry/vestibule area <br />and 35 feet for the majority of the structure. <br />C. Building materials must include EFIS, clear glass in aluminum, glass block <br />panels, and perforated metal panel (as depicted on submitted elevation plans) <br />and/or other materials allowed in Section 1010 of the Roseville City Code. To <br />break-up the building wa114 sport art graphic panels (10 feet by 15 feet - 150 sq. <br />ft.) shall be allowed near the entry. <br />D. The trash/recycling enclosure shall be detached and located in the rear of the site <br />adjacent to the northeast corner of the structure. <br />E. Signage shall be allowed per Section 1009 of the Roseville City Code (as depicted <br />on the building elevations). <br />F. All site and building lighting shall be a cut-off /downcast design with parking lot <br />poles being more of a pedestrian friendly height (to cut down on glare). <br />G. Applicant shall submit a final grading/drainage/erosion/storm water management <br />plan to the City Engineer for review and approval to ensure compliance with the <br />City of Roseville storm water requirements for water quality and rate control. <br />H. Applicant shall submit a final utility plan to the City Engineer for review and <br />approval. <br />I. The Applicant shall submit a final landscape plan to the City Planner, City <br />Engineer, and City Landscape Architect for review and approval. <br />J. Prior to the issuance of a building/grading permit, the applicant must receive a <br />permit from the Rice Creek Watershed. <br />PF3758_RCA_062006.doc Page 6 of 7 <br />