Laserfiche WebLink
8.3 Parking is proposed along the west, east and south sides of the structure, with the <br />proposed storm water management occurring within certain curb islands (infiltration) and <br />within a larger infiltration basin in the front yard. <br />8.4 The City Code does not include an on-site parking ratio for fitness centers. However, the <br />City Planner has reviewed the Code and determined that a ratio similar to an auditorium <br />or public assembly space (4.1 spaces per 1,000 sq. ft. of gross floor area) is a rational fit, <br />but that the ratio should be increased from 4.1 to 4.5 per 1,000 sq. ft. Utilizing a <br />4.5/1,000 sq. ft. would create a requirement of 258 on-site parking spaces for the 55,000 <br />sq. ft facility. The submitted plan indicated 342 on-site parking spaces. <br />8.5 The Development Review Committee (DRC) met on May 25 to complete its <br />review/comment of the submitted proposal and had no substantial comments or concerns. <br />The DRC supported the reviewed structure placement and design, as well as those site <br />changes. The DRC also concluded that the proposal met the purpose and intent of <br />Section 1005 (Business Districts) and 1010 (Design Standards of the City Code and <br />supported its approval through the REZONING and CONDITIONAL USE PERMIT <br />processes. <br />8.6 Before any building permit can be issued by the City, the proposed project (since it is <br />over one acre) will require a storm sewer management surface water permit from the Rice <br />Creek Watershed. The proposal must also meet the City's storm water management <br />requirements and receive the approval of the City Engineer as well as an erosion control <br />permit. A utility plan must be submitted for review and approval by the Public Works <br />Department and Fire Marshal that indicates the location of the properly sized sanitary <br />sewer and water stubs, and appropriate fire hydrant locations. <br />8.7 Signage for the site and building will be required to meet Section 1009 of the Roseville <br />City Code (proposed signage as indicated on elevation drawings meets this requirement) <br />and parking lot lighting (new downcast) will be required to meet Section 1010 of the City <br />Code. <br />8.8 A landscape plan will be required that meets the Street Tree Master Plan for boulevard <br />trees along the service drive (those that will not block views of turning vehicles) and <br />includes internal landscaping consistent with Section 1010. <br />8.9 No EAW is required for the change in use. <br />9.0 STAFF RECOMMENDATION: <br />9.1 Based on the findings of Section 6 of this project report dated June 7, 2006, the City <br />Planner recommends approval of the REZONING from an existing I-1, Light Industrial <br />District to B-2, Retail Business District. <br />PF3758_RCA_062006.doc Page 5 of 7 <br />