Pathway Master Buildout Plan
<br />Estimated Cost
<br />Length
<br />Funding
<br />Traffic
<br />Score
<br />Description
<br />(Miles)
<br />Build Year
<br />Source
<br />Counts
<br />Retaining
<br />(Scoring per 2008 Pathway Master Plan
<br />On Road
<br />Signage
<br />Off Road
<br />Bridge
<br />Striping
<br />Drainage
<br />wall
<br />Total
<br />SEGMENTS
<br />WITH SCORES LESS THAN 90
<br />33
<br />Cohansey St to HANC Connection
<br />89.5
<br />Pathway connection between Cohansey Street
<br />Additional Discussion
<br />Future
<br />NA
<br />30
<br />Villa Park Connections
<br />88 75
<br />Pathway connection from Shryer Ave and from
<br />Not Feasible to construct an ADA compliant pathway without removing significant vegetation
<br />Future
<br />NA
<br />Ran Ave into Villa Park
<br />On and off road pathways from the west City
<br />Boundary to Snelling Avenue This corridor would
<br />2
<br />County Road C2 (W of Snelling)
<br />87
<br />include a grade separated crossing of 35W. Items
<br />Future
<br />2,300
<br />marked with a ( *) are needed for both on road and
<br />off road connection
<br />Off Road
<br />$825
<br />$742,500
<br />$1,675,000
<br />$693
<br />$288,750
<br />$113,850
<br />$2,821,618
<br />Lincoln Dr to Wheeler (around the south side of
<br />Box Culvert with 8 foot wide bituminous trail
<br />0.32
<br />$144,000
<br />$75,000
<br />$56,000
<br />$22,080
<br />$297,080
<br />Oasis Pond)
<br />connecting to existing park trail
<br />Wheeler to Fairview
<br />Isignage and striping along the route
<br />0.13
<br />$325
<br />$273
<br />$598
<br />Fairviewto Langton Lake Park
<br />si na a and stri ing along the route
<br />0.2
<br />$500
<br />$420
<br />$920
<br />Langton Lake Park to Cleveland
<br />6 ft wide sidewalk along one side of the road
<br />0.45
<br />$202,500
<br />$78,750
<br />$31,050
<br />$312,300
<br />Centre Pointe Drive to Long Lake Road
<br />Pedestrian Bridge with 8 ft wide pathway
<br />0.13
<br />$58,500
<br />$1,600,000
<br />$22,750
<br />$8,970
<br />$1,690,220
<br />Long Lake Road to Long Lake Road
<br />6 ft wide sidewalk along one side of the road
<br />0.25
<br />$112,500
<br />$43,750
<br />$17,250
<br />$173,500
<br />Long Lake Road to Highway 88
<br />6 ft wide sidewalk along one side of the road
<br />0.3
<br />$135,000
<br />$52,500
<br />$20,700
<br />$208,200
<br />Highway 88 to Highcrest
<br />6 ft wide sidewalk along one side of the road
<br />0.2
<br />$90,000
<br />$35,000
<br />$13,800
<br />$138,800
<br />On Road
<br />$8,650
<br />$202,500
<br />$1,675,000
<br />$3,9901
<br />$78,750
<br />$31,050
<br />$1,999,940
<br />Lincoln Dr to Wheeler (around the south side of
<br />Box Culvert with 8 foot wide bituminous trail
<br />0.32
<br />$144,000
<br />$75,000
<br />$56,000
<br />$22,080
<br />$297,080
<br />Oasis Pond)
<br />connecting to existing park trail
<br />Wheeler to Fairview
<br />I share the road
<br />0.13
<br />$650
<br />$650
<br />Fairview to Langton Lake Park
<br />share the road
<br />0.2
<br />$1,000
<br />$1,000
<br />Langton Lake Park to Cleveland
<br />share the road
<br />0.45
<br />$2,250
<br />$2,250
<br />Centre Pointe Drive to Long Lake Road
<br />Pedestrian Bridge with 8 ft wide pathway
<br />0.13
<br />$58,500
<br />$1,600,000
<br />$22,750
<br />$8,970
<br />$1,690,220
<br />Long Lake Road to Long Lake Road
<br />stripe shoulders on road
<br />0.25
<br />$1,250
<br />$1,050
<br />$2,300
<br />Long Lake Road to Highway 88
<br />stripe shoulders on road
<br />0.5
<br />$2,500
<br />$2,100
<br />$4,600
<br />Highway 88 to Hi hcrest
<br />stripe shoulders on road
<br />1 0.2
<br />1
<br />$1,000
<br />$8401
<br />1
<br />$1,840
<br />3
<br />County Road C2 (E of Snelling)
<br />86
<br />On and off road pathways from the Snelling
<br />$450,000
<br />$175,000
<br />$69,000
<br />$694,000
<br />Future
<br />2,350
<br />Avenue to Victoria Street
<br />Off Road
<br />Snelling to Hamline
<br />6 ft wide sidewalk on one side of the road
<br />0.5
<br />$225,000
<br />$87,500
<br />$34,500
<br />$347,000
<br />Lexington to Victorial
<br />1 6 ft wide sidewalk on one side of the road
<br />0.5
<br />$225,000
<br />$87,500
<br />$34,500
<br />$347,0001
<br />29
<br />Lovell to Minnesota Connection
<br />80.25
<br />Pathway connection between Lovell Ave an
<br />0.1
<br />$45,000
<br />$17,500
<br />$6,900
<br />$69,400
<br />Future
<br />NA
<br />27
<br />Heinel Drive Connection
<br />75.5
<br />Pathway connection between S Owasso Blvd and
<br />$1,375
<br />$157,500
<br />$1,155
<br />$61,250
<br />$24,150
<br />$245,430
<br />Future
<br />NA
<br />County Road C along Heinel Drive
<br />On Road- Heinel Drive
<br />signage and striping along the route
<br />0.55
<br />$1,375
<br />$1,155
<br />$2,530
<br />Pathway
<br />Construct 8 ft wide pathway adjacent to Railroad
<br />0.35
<br />$157,500
<br />$61,250
<br />$24,150
<br />$242,900
<br />tracks connecting to Victoria Street
<br />28
<br />Judith to Iona Connection
<br />72.75
<br />Pathway connection between Judith Ave and Iona
<br />0.1
<br />$40,000
<br />$17,500
<br />$5,750
<br />$63,250
<br />Future
<br />arks
<br />NA
<br />23
<br />Langton Lake Loop
<br />72.5
<br />Pathway that goes around all of Langton Lake
<br />Future
<br />NA
<br />On Road
<br />0.4
<br />$1,000
<br />$840
<br />$1,840
<br />On and off road facilities as a part of public street
<br />infrastructure project within Twin Lakes
<br />Developer/
<br />24
<br />Twin Lakes Redevelopment Area Connections
<br />56.75
<br />Redevelopment area (between Fairview and
<br />no estimate- will be constructed as a part of development
<br />Future
<br />NA
<br />Cleveland) Provide connection from the
<br />T IF/ Assess
<br />redevelopment area into Langton Lake Park
<br />32
<br />Eustis to St Croix Connection
<br />49
<br />Pathway connection between Eustis 6treet and St
<br />0.2
<br />$80,000
<br />$13,800
<br />$93,800
<br />Future
<br />NA
<br />4 of 4 8/22/2013
<br />
|