My WebLink
|
Help
|
About
|
Sign Out
Home
2014_0512_CCpacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2014
>
2014_0512_CCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2014 1:45:24 PM
Creation date
5/8/2014 2:29:59 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Interviews were conducted on all 11 packages separately with individuals from all firms. The purpose was <br />t for them to describe their proposed plan, approach and cost estimates to the evaluation team. <br />., With guidance from the City Attorney, LHB and Arizona State University (ASU), request for proposals <br />� (RFP's) were prepared and issued for all 12 project packages totaling of $12,858,800 as outlined in the <br />� Renewal Program. Specifically the packages include: A) Buildings, Shelters and Related Site Wark B) <br />,. Skating Center Repairs C) Harriet Alexander Nature Center Improvements D) Bridges and Boardwalk <br />�, E) Lighting F) Tennis Courts, G) Field Improvements H) Irrigation I) Natural Resources J) Disc Golf <br />� Course Improvements K) B2 and Victoria Street Sidewalk K3) Pathways in Various Park Locations. All <br />�� projects were outlined at the onset and throughout the Renewal Program. ASU monitored and provided <br />�� education, during the City's implementation of the Best Value process for each of the 12 packages. <br />��� A total of 4 pre-proposal education sessions were held for interested vendors. Attending at least one was <br />� required in order to submit a proposal. At these sessions, vendors were educated on the entire process. <br />�:� ASU was available to answer questions about the technical aspects of the process along the way; vendors <br />��� were encouraged to make contact as needed to educate them. ASU monitored, and provided education, <br />�� during the City's implementation of the Best Value process for each of the 12 packages. <br />c �� <br />�- The process for all 12 packages is now complete. The Best Value contractor has been identified in each <br />E� package except for the Skating Center Repairs where no proposals were received. The recommendations <br />.. below maintain the integrity, quality and program intent of the overall Renewal Program. <br />� The Best Value Business Model has been a very thorough and time consuming process up front. Investing <br />� this amount of time in the process up front is expected to allow for a smoother process getting started, <br />� along the way and at the finish. Only "unforeseen" risks or client requested changes will need to be <br />� addressed by the City. <br />��� Attached is a typical standard City Construction Services Agreement, a Pre- Award Document and the <br />. Best Value selection summary for all packages. The City Attorney has been involved along the way and <br />E: will continue to provide guidance to finalize all documents. <br />�� Included in your packet is a summary of the Best Value process from Jake Smithwick at Arizona State <br />E University. <br />e Included in your packet is an analysis of all proposals and a recommendation from Michael Schroeder, <br />E: LHB and Lead Final Design Consultant. <br />E:� Included in your packet is a recommendation letter from Kristine Giga, City Civil Engineer on the B2 and <br />E�� Victoria sidewalk project. <br />� Overall, this is a very unique and complex program because there are numerous projects to occur <br />� throughout the City and the work will need to be coordinated and performed around an extensive <br />, recreation program and high use park system. <br />, Based upon the extensive, thorough and lengthy process; overall community involvement, program intent <br />. and the final designs, a staff summary and recommendation for each package is below: <br />Page 2 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.