My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02381
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2300
>
pf_02381
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 11:50:15 AM
Creation date
12/8/2004 11:11:20 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2381
Planning Files - Type
Variance
Address
2500 WALNUT ST
Applicant
WINTZ, GEORGE
Status
APPROVED
PIN
082923230003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />2323 Terminal Road . P.O. Box 64098 . St. Paul, MN 55164 . (612) 631-5900 <br /> <br />October 2, 1992 <br /> <br />Hand Delivered <br /> <br />Mr. Rick Jopke <br />Assistant community Development Director <br />City of Roseville <br />2660 civic Center Drive <br />Roseville, MN 55113 <br /> <br />Re: Extension of Variance - 2500 Walnut street <br /> <br />Dear Mr. Jopke: <br /> <br />I am writing to request an additional extension of the <br />variance granted by the Roseville city council on September 23, <br />1991. The approved variance was for a parking setback at the wintz <br />Companies' warehouse located at 2500 Walnut Street. In support of <br />the variance, we proposed a blacktop project with landscaping for <br />that location. <br /> <br />The original variance was extended by the City Council at its <br />March 23, 1992 meeting. The variance was extended due to our <br />inability to commence the project given the early winter of 1991. <br />Orj gJ nally t we were forced to f:ustf'un-::: 4I!til the SlEnmer ç.f 1 ~92. <br />The City council approved an extension of the variance until <br />September 30, 1992. <br /> <br />As explained to Mr. Phil Carlson on September 30, 1992, wintz <br />Companies' plans and desires for this project have not changed. <br />However, we were unable to initiate the construction during the <br />summer of 1992 as a result of economic constraints and <br />unanticipated expenditures in other phases of our Company. As you <br />know, the economy has remained considerably stagnant during the <br />last year. This has limited our ability to make expenditures of <br />approximately $225,000 for this project. Moreover, our Company <br />encountered other unanticipated expenditures relating to <br />replacement of our rolling stock and physical improvements at our <br />other facilities. Combined, we did not believe we were in a <br />position to undertake and complete the project during this fiscal <br /> <br />ltea=- . <br />
The URL can be used to link to this page
Your browser does not support the video tag.