Laserfiche WebLink
<br />screening, trash handling, lighting, and other issues. With these standards, <br />pennitted uses are reviewed by City staff for compliance with applicable <br />code standards. If the standards are met, a building pennit can be issued. <br /> <br />The Computer City proJect, ..B~~Cl1w.oodAcquisitionsis.now . proposing, <br />reduces the size ofthebuildingftom 18,000 sq. ft. to 15,000 sq. ft. As <br />the attached site plan indicates, tl1e,buildinghasbeenreconfigured and <br />repositioned. on the site ina way that is .morecompatible with the <br />CrossroadsCentef..Ofl1e:new;siteplall:also<moves the access .point to the <br />project. further away from the shared driveway. easement servicing the <br />shopping center. This should reduce concerns about traffic stacking that <br />were raised with the previous site plan. With the previous application, <br />concerns were also expressed about the building material proposed (a <br />textured concrete panel) not being compatib~e with surrounding <br />commercial development. The new building proposes face brick with <br />split face masonry accents. <br /> <br />SITE ANALYSIS <br /> <br />Total Site Area <br />Proposed Building <br />Proposed Parking <br />Green space <br />Existing Center Driveway <br />Existing City Sidewalk <br />Future City Sidewalk <br /> <br />84,092 sq. ft. . <br />15,000 sq. ft. (17.80/0) <br />37,340 sq. ft. (44.4%) <br />24,792 sq. ft. (29.50/0) <br />4,860 sq. ft. (5.8%) <br />660 sq. ft. (0.8%) <br />1,440 sq. ft. (1.70/0) <br /> <br />Parking Required: 5 spaces per 1,000 sq. ft. building floor area = <br />75 stalls. <br /> <br />Handicap Accessible Parking Required: 1 accessible stall per 25 <br />stalls = 3 stalls. <br /> <br />PARKING PROVIDED: <br /> <br />Full Size (9xI8) <br />Handicap Accessible <br />Handicap Van Accessible <br />Total Parking Provided <br /> <br />71 stalls <br />3 stalls <br />1 stall <br />75 stalls <br />