Laserfiche WebLink
<br />E. All plants shall be first-class representatives of their normal species or variety, and shall be <br />free of disease, disfiguring knots, sun scald, insect infestations, dead or broken branches, <br />bark abrasions, and other objectionable conditions. <br /> <br />F. During the spring planting season, any Evergreen plant delivered with new growth in advance <br />stage of candling out will be rejected. Evergreen trees not fully branched from bottom to top <br />will be rejected and those with terminal leaders exceeding 18 inches in length will also be <br />~ect~. - <br /> <br />G. Mulch: Shredded hardwood mulch, except where noted on plan - 6" for trees, 3" for shrubs. <br /> <br />H. Landscape Fiber Mat: 100 percent textile glass fiber roll, 1/8 inches thick, "Weed-chek" <br />Landscape Mat (Brighton By-Products Co., Inc.); or equal will be approved. <br /> <br />I. Seed shall be tagged to comply with the requirements of the specified seed mixture and <br />subject to the approval of the Landscape Architect. <br /> <br />J. Seed mix #500 per MnDot Specification 3876, 1988 Edition (as revised 5/2194): <br /> <br />Lawn Mix <br />Bluegrass, "Park" Kentucky <br />Bluestem, little <br />Bromegrass, smooth <br />Rye-grass. perennial <br />Switch grass <br />Wheat-grass, slender <br />Timothy <br /> <br />TOTAL <br /> <br />Relative Percents <br />30.0% <br />6.0% <br />20.0% <br />20.0% <br />8.0% <br />8.0% <br />8.0% <br />100.0% <br /> <br />Apply at 100 pounds per acre. Total weed seed not to exceed 1-percent. No noxious weed <br />seed is allowed. <br /> <br />K. Erosion Control Blankets: Excel Superior with (6"x1"x6"-11 gauge) erosion control staples, <br />or authorized equivalent. <br /> <br />SEEDING, LAWNS <br /> <br />A. Rough and finish grading by others. <br /> <br />8. Seeding by hydroseeding or broadcast seeding in accordance with MnDot Specification <br />2575, 1988 Edition (as revised 5/2194). <br /> <br />C. Firming the seed bed will be required. <br /> <br />D. Seeding to be accomplished between April 15 and June 15 or between August 15 and <br />September 15. Seeding outside these times requires written approval of the Landscape <br />Architect. <br /> <br />E. All seed to conform to the requirements of the latest seed laws of the state and the latest <br />MnDot Specifications. <br />