My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02637
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2600
>
pf_02637
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:01:48 PM
Creation date
12/8/2004 12:13:34 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2637
Planning Files - Type
Planned Unit Development
Address
2770 SNELLING AVE N
Applicant
ROSEVILLE CROSSINGS
PIN
042923440012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Space or <br />Building <br /> <br />City Code <br />Requirement <br /> <br />User Parking <br />Requirement <br /> <br />Provided <br />Parking <br /> <br />Restaurant <br />328 seats - 2.5 <br />plus 400 SF - 20 <br /> <br />151 <br /> <br />140 <br /> <br />140 <br /> <br />Video 6,000 SF <br />5 spaces/l~OOO SF <br /> <br />73 <br /> <br />75 <br /> <br />75 <br /> <br />Food 2,400 SF <br />20 seats - 2.5 <br />Food 1,200 SF <br />20 seats - 2.5 <br /> <br />Auto Service 5.333 SF <br />5 spaces/1~000 SF <br /> <br />47 <br /> <br />47 <br /> <br />52 <br /> <br />Food 3,667 SF <br />50 seats - 2.5 <br /> <br />Bank 6000 SF <br />6 spaces/1,OOO SF <br /> <br />36 <br /> <br />36 <br /> <br />40 <br /> <br />TOTAL <br /> <br />307 <br /> <br />298 <br /> <br />307 <br /> <br />SITE GRADING AND PONDING: The site grading will direct surface water flow to the <br />northeast. The storm water will be collected with a storm sewer system that will direct water to a <br />new 9~000 square foot NURP pond in the northeast corner, This pond will be a wet pond which <br />will allow for parking lot sediment collection allowing the water to enter the city's storm sewer <br />system. The Engineering Department has reviewed the drainage calculations and the pond design <br />and finds that the drainage system and pond meet design standards for the City. <br /> <br />BUILDING MATERIALS: It is the developer's intent to construct each of the four buildings <br />with materials in a combination of one or totally of the following: <br /> <br />face brick <br />pre-colored textured concrete block <br />glass <br />exterior insulated finished system (E.I.F.S.) creating a stucco type appearance <br />fabric canopies were shown (color varies by user) <br />wood stain <br />wood shingles and colored roof tile shingles <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.