<br />214.2 <br /> <br />214.3 <br /> <br />214.4 <br /> <br />214.5 <br /> <br />214.6 <br /> <br />215.0 <br /> <br />215.1 <br /> <br />~~ -!.,., <br /> <br />200-12 <br /> <br />reproducible copy) of all Shop Drawings, which shall have been <br />checked and approved by the CONTRACTOR. The data shown on the <br />Shop Drawings shall be complete with respect to dimensions, <br />design criteria, 'materials of construction and~other, details to <br />enable the ENGINEER to review the information as, required. <br /> <br />The CONTRACTOR shall also submit to the ENGINEER ,for. approv~l, <br />with such promptness as to cause no delay in the Work, all. <br />samples required by the Contract Documents. All ,samples s:hall <br />be checked and approved by the CONTRACTOR, identified clearly as <br />to material, manufacturer, any pertinent catalog numbers and the <br />use for which intended prior to suPmitting them to, the ENGINEER. <br /> <br />At the time of each submission, the CONTRACTOR will, in wri~in9, <br />call the ENGINEER'S attention to any deviations that the Shop <br />Drawings or, sample may have from the requirements of'Contrac~, <br />Documents. <br /> <br />b. <br />I <br />, <br />'I- <br />~ <br />- <br />. <br />"~I <br />I <br /> <br /> <br /> <br /> <br />I <br />, <br />I <br /> <br />The ENGINEER. will check and approve," with reasonable prompt.ness, <br />S~op Drawings and samples, but his checking and approval shall <br />be limited to review for conformance with the design concept of <br />the Project and for compliance with the information given in the <br />contract Documents. The CONTRACTOR shall make any corrections <br />required by the ENGINEER and return the required number of <br />corrected copies of Shop Drawings or re-submit new samples. The <br />approval of a separate item,' as such, will not indicate approval <br />of the assembly in which the item functions. ' <br /> <br />No Work requiring a Shop Drawing or sa~ple submission shall be <br />undertaken until the submission has been approved by the <br />ENGINEER. <br /> <br />I <br />,(',\ <br />.~ <br />.1 <br />I <br />I <br />t <br />t <br /> <br /> <br />, <br /> <br /> <br />l' <br />jr* <br />~ <br />I <br />. <br />I <br /> <br />The ENGINEER'S approval of Shop Drawings or samples shall not <br />relieve the CONTRACTOR from his responsibility for any <br />deviations from the requirements of the Contract Documents <br />unless the CONTRACTOR has, in writinq, called the ENGINEER'S ' <br />attention to 'such deviations at the time of submission and the <br />ENGINEER has given written approval to the specific deviation, <br />nor shall it relieve the CONTRACTOR from errors or omissions in <br />the Shop Drawings.. <br /> <br />l\VAILABILITY OF LANDS: PHYSIC~L AND SUBSURFAC~ CONDITIONS: <br />BEFERENCE POINTS <br /> <br />The OWNER will provide, as indicated in the Contract Documents, <br />the lands upon which the work is to be done, rights-af-way for <br />access thereto, such other lands which are designated for <br />the use of the 'CONTRACTOR, and all pe~its from governmental <br />agencies neoessary far~the work to proceed which shall be done <br />by the OWNER 'with reasonable promptness. If the CONTRACTOR <br />believes that there has been delay in OWNER'S furnishing these -~ <br />lands,' rights-of-way, easements, or permits, the CONTRACTOR'S <br />sole remedy shall be an extension of conqact time, for which <br />the CONTRACTOR may make a claim therefore as provided in section <br />236. <br />