Laserfiche WebLink
<br />3.9 Finish Grading <br /> <br />After proper compaction, the graded area shall be shaped <br />and fine graded to the section shown on the drawings. <br /> <br />After fine grading, the Contractor shall notify the <br />Engineer as to a convenient time for inspection of the <br />Project. The Enginee~, at his discretion, may request <br />the Contractor to verify the elevations as specified on <br />the plans. <br /> <br />Surplus material shall be removed and disposed of as <br />directed by the Engineer or Owner. <br /> <br />The finished subgrade shall present a neat and <br />workmanlike appearance. <br /> <br />2200-4 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />