Laserfiche WebLink
<br />MEMO <br /> <br />To: <br />From: <br />Subject: <br />Date: <br /> <br />File <br />RICK JOPKE <br />4/29/97 Meeting with Rich Kettler <br />April 29, 1997 <br /> <br />I met with Rich Kettler on 4/29/97 at the Rosetown Ridge site to discuss how to complete the <br />grading, drainage, and landscaping along the south edge of the project and how to minimize the <br />impact on the park. Others attending were the Rosetown Ridge property manager, Len Pratt, <br />Chuck Stifter, and Baron Behning. It was agreed that the following actions would occur: <br /> <br />1. The stakes marking the property line would be reestablished immediately. <br /> <br />2. The construction limits fence would be reestablished 15 feet south of the property line <br />immeditely. <br /> <br />3. The silt fence would be reestablished immediately. <br /> <br />4. City staff will review and approve 1-3 above once they are completed. <br /> <br />5. Chuck Plowe would be directed to design a solution to handle drainage along the south <br />property line. Issues to be addressed include how to minimize impact on the park, how to <br />handle roof drainage, how to provide a solution which which can be constructed within <br />the limited space available ( 3.5 to 5 feet). Chuck Plowe will provide a design for staff to <br />reVIew. <br /> <br />6. Kettler will provide a schedule for completion of incomplete items. <br /> <br />7. We will meet on the site to review the proposed solution. <br /> <br />C:\ WPWIN60\ TEMP LA TE\MEMO\429KET.MEM <br />