My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02823
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2800
>
pf_02823
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:13:48 PM
Creation date
12/8/2004 1:20:07 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2823
Planning Files - Type
Division of Land
Address
350 OWASSO BLVD S
Applicant
TSCHIDA, FRANK
Status
APPROVED
PIN
012923130090
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />TSCIDDA OW ASSO HILLS PLAT 4 <br /> <br />The width and location of the subgrade shall be within 1.0 foot of the width and <br />location shown on the plans. <br /> <br />NOTE: START UP OF UTILITY CONSTRUCTION WILL <br />CONSTITUTE ACCEPTANCE OF THE STREET SUB GRADE. <br /> <br />2.3 Backfillini and Trench Compaction <br /> <br />A. The backfilling shall be accomplished with the use of suitable materials selected <br />from the excavated materials to the extent available and practical. Should the <br />materials available within the trench section be unsuitable or insufficient, the <br />Contractor shall, when directed by the Engineer, replace unsuitable material <br />beneath roadways with suitable materials from other parts of the project. <br /> <br />The removal and disposal of unsuitable material and the hauling, placing and <br />compacting of the surplus material, shall be considered incidental to the sewer <br />installation and no payment will be made for this item. <br /> <br />Compaction of the backfill shall be done on lifts of uniform layers of loose <br />material, not to exceed 12" except that by the authority of the Engineer in <br />consideration of the demonstrated capability of special type vibratory compactors, <br />these maximums may be increased at his discretion. Each lift shall be compacted <br />over the full width of excavated area as specified herein. <br /> <br />Service trenches must be compacted in the same manner as the main trench. In <br />areas where curb and gutter exists, sufficient curbing shall be removed to allow <br />the prescribed compaction over the entire disturbed area. <br /> <br />A minimum of one utility trench compaction test per every two stations measured <br />along centerline is to be taken below the upper three (3) feet of trench backfill. <br /> <br />2.4 Pipe Beddini <br /> <br />All PVC Pipe shall be bedded in granular material to springline. Granular <br />bedding material is incidental to PVC pipe unit bid price. Class B bedding shall <br />be used for PVC pipe. <br /> <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.