My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02823
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2800
>
pf_02823
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:13:48 PM
Creation date
12/8/2004 1:20:07 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2823
Planning Files - Type
Division of Land
Address
350 OWASSO BLVD S
Applicant
TSCHIDA, FRANK
Status
APPROVED
PIN
012923130090
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />and any imperfections so detected shall be corrected by cleaning, trimming, or repair as <br />needed. <br /> <br />All pipe shall be laid using grade boards, furnished and set by the Contractor according <br />to the grade stakes established by the ENGINEER or his representative. No pipe shall <br />be laid unless there is a minimum of four grade boards set to check the proper grade and <br />. alignment ahead. The Contractor shall provide and use a suitable grade rod to insure the <br />proper grade of the pipe. Grade Boards shall be no more than 25 feet apart. The <br />Contractor may use laser equipment in lieu of grade boards and strings to set pipe grade <br />and alignment. However, the Contractor shall check the grades at a frequency not to <br />exceed 100 feet. The Contractor shall provide competent workmen to operate the laser <br />equipment. <br /> <br />At that time of pipe placement, the bedding conditions shall be such as to provide <br />uniform and continuous support for the pipe between bell holes. Bell holes shall be <br />excavated as necessary to make the joint connections, but they shall be no larger than <br />would be adequate. No pipe material shall be laid in water nor when the trench or <br />bedding conditions are otherwise unsuitable or improper. Unless otherwise permitted by <br />the ENGINEER, bell and spigot pipe shall be laid with the bell ends facing upgrade and <br />the laying shall start at the downgrade end and proceed upgrade. <br /> <br />When placement or handling precautions prove inadequate, in the ENGINEER'S <br />opinion, the Contractor shall provide and install suitable plugs or caps effectively closing <br />the open ends of each pipe section before it is lowered into laying position, and they <br />shall remain so covered until removal is necessary for connection of an adjoining unit. <br /> <br />As each length of bell and spigot pipe is placed in laying position, the spigot end shall be <br />centered in the bell and the pipe forced home and brought to correct line and grade. The <br />pipe shall be secured in place with approved backfill material, which shall be thoroughly <br />compacted around the pipe as described in Section 302.7. The joint areas shall remain <br />exposed and precautions shall be taken to prevent the soil from entering the joint space, <br />until the joint seal is effected. <br /> <br />Whenever existing utility structures or branch connections leading to main sewers or to <br />main drains, or other conduits, ducts, pipes, or structures present obstructions to the <br />grade and alignment of the pipe, they shall be permanently supported, removed, <br />relocated or reconstructed by the Contractor involved. In those instances where their <br />relocation or reconstruction is impractical, a deviation from line and grade will be <br />ordered, and the change shall be made in the manner directed by the ENGINEER and <br />with extra compensation allowed therefore. <br /> <br />When watermain, water services and sewer services, whether lowered or existing, are in <br />danger of freezing due to the proximity of storm sewers, catch basin leads, or storm <br />sewer structures, the ENGINEER may direct the placement of insulation between the <br />storm sewer and the watermain or service pipe, as specified in Section 303.9. <br /> <br />500-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.