My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02823
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2800
>
pf_02823
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:13:48 PM
Creation date
12/8/2004 1:20:07 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2823
Planning Files - Type
Division of Land
Address
350 OWASSO BLVD S
Applicant
TSCHIDA, FRANK
Status
APPROVED
PIN
012923130090
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />TSCHIDA OW ASSO HILLS PLAT 4 <br /> <br />5.5 Tack Coat <br /> <br />Payment will be at the contract unit price per gallon of tack coat furnished and placed. <br />Measurement will be the certified weight tickets given to the project representative. <br /> <br />5.6 Adjust Valve Box <br /> <br />Payment will be made at the contract unit price and will be compensation in full for all <br />costs incidental thereto including but not limited to, furnishing extensions as required <br />and replacing any materials damaged by the Contractor's operations. A second <br />adjustment for the wearing course is incidental. <br /> <br />5.7 Adjust Casting Assembly <br /> <br />Payment will be made at the contract unit price and each casting adjustment will be <br />measured as unit including all labor, material, and equipment necessary to reset <br />existing casting to the proposed grade. A second adjustment for the wearing course is <br />incidental. <br /> <br />Od.!\'.W*'" <br /> <br />5.8 Concrete Curb & Gutter <br /> <br />Payment will be made at the contract unit price per lineal foot of concrete curb. One <br />contract unit price for all concrete curb and gutter including dri\'eway openings. <br />Measurement will be the measured in-place lineal feet of curb and gutter. Driveway <br />aprons are not included in this contract. <br /> <br />5.9 Saw Cut Existing Bituminous <br /> <br />Payment \vill be included in contract lump sum price for street restoration. <br /> <br />5.1 0 Street Restoration <br /> <br />Payment will be at the contract unit price. Measurement will be lump sum and will <br />include all labor, tools, equipment, materials, and cleanup as required for complete <br />restoration of street area disturbed during construction. <br />-8- <br />
The URL can be used to link to this page
Your browser does not support the video tag.