My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02823
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2800
>
pf_02823
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:13:48 PM
Creation date
12/8/2004 1:20:07 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2823
Planning Files - Type
Division of Land
Address
350 OWASSO BLVD S
Applicant
TSCHIDA, FRANK
Status
APPROVED
PIN
012923130090
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />19. EROSION AND SILTATION CONTROL <br /> <br />Extreme care shall be exercised in all phases of the project to control erosion and siltation <br />into drainage ways, The Contractor shall be required to provide dikes and straw bale weirs <br />in all areas where runoff could cause siltation. <br /> <br />In addition, the Contractor shall provide interim sumps of adequate size to intercept silt in <br />areas of concentrated runoff. These sumps shall be maintained in such a manner as to <br />prevent siltation of the natural ponding areas, storm sewers and flood plain downstream <br />from the project. Seeding and mulching or sodding shall be required in aU areas disturbed, <br />as noted in the plan or as directed by the Engineer for the purposes of erosion control. <br /> <br /> <br />20. MERGED ITEMS <br /> <br />The cost of aU material and labor required to complete this project as specified and shown <br />on the plans, but not specifically included as a pay item, shall be merged with the various <br />unit prices bid. <br /> <br />21. PROTECTION OF SURVEY MONUMENTS <br /> <br />Survey monuments (survey control points, block corners, lot irons, etc.) may be in place or <br />may be installed during the construction period. The Contractor shall protect all survey <br />monuments which are marked in the field to be saved. In case any monument or stake is <br />disturbed by the Contractor without orders from the Engineer, the Contractor will be charged <br />the cost of the survey and other work required to relocate same. All existing survey <br />monuments will be replaced at completion of project. <br /> <br />22. STORAGE OF EQUIPMENT AND MATERIALS <br /> <br />The Contractor may make use of the Owner's property for the storage of equipment and <br />materials required for the work during the period of the contract. The written approval of <br />any other property owner used for such storage shall be obtained by the Contractor and a <br />copy of said approval supplied to the Engineer. <br /> <br />The Owner accepts no liability for any damages and/or claims that may occur as a result of <br />using private property for storage purposes. <br /> <br />-5- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.