Laserfiche WebLink
<br />12. Physical Impacts on Water Resources. Will the project involve the physical or hydrologic alteration <br />(dredging, filling, stream diversion, outfall structure, diking, impoundment) of any surface water (lake, <br />pond, wetland, stream, drainage ditch)? <br /> <br />Yes -X No <br /> <br />If yes, identify the water resource to be affected and describe: the alteration, including the construction <br />process; volumes of dredged or fill material; area affected; length of stream diversion; water surface <br />area affected; timing and extent of fluctuations in water surface elevations; spoils disposal sites; and <br />proposed mitigation measures to minimize impacts. <br /> <br />13. Water Use <br /> <br />a. Will the project involve the installation or abandonment of any wells? <br /> <br />..x.. Yes <br /> <br />No <br /> <br />Response: City records indicate that three parcels within the project area have had wells installed in <br />the past. Further investigation will be required at the time of redevelopment to determine the status <br />of these wells. Any open wells will require abandonment at the time of redevelopment. The following <br />is a brief summary of the city well records for the three parcels: <br /> <br />Parcel # 13: 1947 County Road C, 6-inch diameter well, 400 feet deep. <br />Parcel #17: 2785 Fairview Avenue, 6-inch diameter well, 530 feet deep. <br />Parcel #19: 2711 Fairview Avenue, 4-inch diameter well, 139 feet deep. <br /> <br />The development will be served by the existing municipal water system and will not involve the <br />installation of any wells. <br /> <br />The Development will be served by the existing municipal water system and will not involve the <br />installation of any wells. <br /> <br />b. Will the project require an appropriation of ground or surface water (including dewatering)? <br /> <br />Yes <br /> <br />..x.. No <br /> <br />Response: The project will not require ground or surface water appropriation. Dewatering activities <br />are not anticipated during the project construction period. <br /> <br />c. Will the project require connection to a public water supply? <br /> <br />..x Yes <br /> <br />_No <br /> <br />If yes, identify the supply, the DNR water appropriation permit number of the supply, and the <br />quantity to be used. <br /> <br />Response: All development within the project area will utilize the City of Roseville municipal water <br />supply. Roseville receives its water supply ftom the City of St. Paul distribution system. The <br />following DNR water appropriation permit numbers apply to the City of Roseville water supply: <br /> <br />#24397 <br /> <br />9 <br />