My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02880
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2800
>
pf_02880
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:19:15 PM
Creation date
12/8/2004 1:23:31 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2880
Planning Files - Type
Planned Unit Development
Address
2660 CIVIC CENTER DR
Applicant
TWIN LAKES
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
844
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />/' <br /> <br />K:VWU <br /> <br />~".... <br />e <br /> <br />September 22, 1997 <br /> <br />Jim Zahn <br />Ryan Companies U.S. <br />700 International Centre <br />900 Second Avenue S. <br />Minneapolis, MN 55402-3387 <br /> <br />RE: CENTRE POINTE II <br /> <br />Dear Mr. Zahn: <br /> <br />After our meeting on September 8, 1997, I followed up on a number of issues raised at the <br />meeting. The issues are as follows: <br /> <br />1. Pondin~-I have discussed the ponding situation with Kate Drewry of the Rice Creek <br />Watershed District. She indicated that the pond could be modified; however, to modify the <br />design would require that an amended permit be presented to the Rice Creek board. For the <br />purposes of your building permit, the maximum slope allowed is 3: 1 and the area adjacent to <br />the pond should be restored with long grasses which are not mowed. <br /> <br />2. Traffic circulation-As discussed at the meeting, there are some concerns regarding the <br />circulation of vehicles within the site. I asked Glen Van Wormer, the City's traffic <br />consultant, to take a look at the site plan and provide comments. A copy of his comments <br />are enclosed. The main concerns regarding traffic are: <br /> <br />. Driveway widths, particularly at the entrance located near the south side of the <br />buildings. <br /> <br />· Maneuvering and accessibility within the truck loading area. <br /> <br />· Maneuverability of vehicles within the parking areas. <br /> <br />. Driveway.locations as they relate to future development to the west and south of the <br />site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.