Laserfiche WebLink
<br />Mr. Jack Hunter <br /> <br />-3- <br /> <br />February 24, 1997 <br /> <br />In closing, I would like to reaffirm the interest you expressed to promptly resolve the <br />issues associated with the traffic study report prepared by your firm. Specifically, I would <br />suggest that you write a letter to your client and the City ofRoseville that expresses the <br />following two basic points: <br /> <br />a) That the existing report does not meet anyone's standards, as you expressed to me <br /> <br />b) That the traffic study and report need to be redone consistent with pertinent <br />standards and to include the points a) through h) that I have expressed above <br /> <br />Let me know if you have any questions about the points addressed in this letter. Also, <br />please keep me informed regarding the follow-up steps that you accomplish to resolve this <br />Issue. <br /> <br />Sincerely, <br /> <br />BENSHOOF & ASSOCIATES, INC. <br /> <br /> <br />1: A Benshoof <br /> <br /> <br />Enclosures: map of roadway system and major nearby developments in Centre Pointe area <br />drawing of planned Twin Lakes Parkway <br />