My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02976
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2900
>
pf_02976
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:26:35 PM
Creation date
12/8/2004 1:55:40 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2976
Planning Files - Type
Planning-Other
Address
2800 ARONA ST
Applicant
ARONA DEVELOPMENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Existinq Data Review <br /> <br />The Property was toured on January 21, 1991, to familiarize and <br />orient important site and local features to available maps, <br />photographs, and other information. sequential aerial photographs <br />from 1940, 1945, 1953, 1957, and 1989 (References 1, 2 and 3) <br />were reviewed to assess historical land use practices. Local <br />physiography was evaluated by reviewing topographic maps <br />available from the united states Geological Survey (USGS) <br />(Reference 4). Soil classifications for the Property were <br />obtained from soil survey data published by the united states <br />Department of Agriculture (USDA) (Reference 5). The location of <br />filled areas, dumps, landfills, spills and ongoing clean-up <br />activities documented by the USDA (Reference 5) and the Minnesota <br />Pollution Control Agency (MPCA) (Reference 6) were identified and <br />compared to the Property location. <br /> <br />site Inspection <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The building and property were inspected by Northern <br />Environmental personnel on January 21, 1991. This inspection <br />included a walkthrough of the building and the immediate areas to <br />the south, west and north of the building. Snow cover over the <br />remainder of the Property prevented the collection of surficial <br />soil samples for evaluation and the evaluation and recording of <br />areas which may exhibit such characteristics as stained soils, <br />stressed vegetation, or which might be found to be littered with <br />debris. <br /> <br />Walkthrough Asbestos Inspection <br /> <br />Representatives of Northern Environmental and Bay West, Inc. <br />conducted a walkthrough asbestos inspection of the building on <br />January 21, 1991. This inspection was limited to visual <br />observations. The inspection did not include the collection of <br />samples of suspected materials containing asbestos nor inspection <br />of non-accessible areas such as piping inside floor spaces. <br /> <br />Data Analvsis and Report Preparation <br /> <br />Data collected during the completion of tasks 1 through 3 were <br />evaluated and assembled into the following assessment report. <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.