My WebLink
|
Help
|
About
|
Sign Out
Home
pf_02985
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF2000 - PF2999
>
2900
>
pf_02985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:27:34 PM
Creation date
12/8/2004 1:56:54 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
2985
Planning Files - Type
Interim Use Permit
Address
515 LARPENTEUR AVE W
Applicant
RAMSEY COUNTY
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />J&T Rehab. Services <br /> <br />TEL:612-628-6917 <br /> <br />Feb 10 98 <br /> <br />16:20 No.003 P.02 <br /> <br /> <br />Page 2 of 3 <br />Paragraph 2. (con't) 2. Public sHfety -what will be <br />placed around the stockpiled rubble to prevent <br />rats,mice,mosquitoos,flies and other vermin from <br />infesting the place and bGcoming a nuisance to the <br />safety of the community? <br />3.Additional costs- who will ultimately pay for <br />the extremely high costs of cleaning up the ground <br />water and the natural wetland just East of the ProjGct? <br />Keeping in mind that there will be many hundreds of <br />pounds of salt, lime, tar, asphalt and other caustic <br />agents leaching from the stockpile of concrete while <br />it awaits the convenience of the road rebuilders. <br /> <br />Paragraph 3.The vague reference to "construction soason <br />in 2000" suggGsts to me that very little will be done <br />during 1998 and 1999 and then we wi.11 suf[Gr greatly <br />throughout the year of 2000 when the contractors are <br />finally forced to bring in the appropriate equipment to <br />complete the job. r suspect this fr.om my own <br />experience on construction crews and having watched the <br />comedy team of street renovators here in Roseville. <br />They must be entertainers because they keep getting <br />called back for encore performances on one project <br />after another. <br /> <br />Paragraph 4. What will happen if the road construction <br />projGct runs over the "five workj.ng days per occasion"? <br />Will they be liable for leaving the partiD1J.y finished <br />roads impassable or will we, the TAXPAYERS, be told <br />that we can continue suffering the leisurely pace of <br />construction with no T.ecoursc, because we did not speak <br />up beforehand? <br /> <br />Paragraph 5.Regarding thG decibels measurcd;at wh~t <br />distance from the project was this m0asurement planned <br />to be monitored? Further,were all of the other quoted <br />decibel measurements taken at the same distance under <br />the same conditions, Gte. <br />
The URL can be used to link to this page
Your browser does not support the video tag.