Laserfiche WebLink
<br />3.2 To meet City Building and Zoning Code requirements, the existing foundations and <br />utilities would be upgraded, the facade of the building will be upgraded, the parking <br />area will be expanded and improved with perimeter curbing, the site will be <br />landscaped, new signage will be installed, and the building will be sprinklered. <br />Existing roof trusses would be improved and strengthened to support a second <br />story. Since the City policy does not allow commercial properties to drain their <br />surface water to the street, storm sewer would have to be extended into the parking <br />area from Cleveland Avenue to catch surface water drainage from the site. A site <br />plan from the Schreier's engineer shows that this is possible. The concept plan <br />includes the retention of the two existing driveways (curb cuts) on Cleveland <br />Avenue, The northern driveway will be designated as an exit, with the angle parking <br />shown on the concept plan to encourage the one-way flow of traffic from south to <br />north. The southern driveway most likely will be realigned to facilitate the flow of <br />traffic into the parking area and loading space for trucks. <br /> <br />3.3 Preliminary site development plans have been submitted, with a concept plan <br />showing a parking arrangement with 12 parking spaces and loading area. Assuming <br />that 15 percent of the bu ilding is used for storage area or non-productive common <br />space, the number of off-street parking spaces proposed (12) for 8,500 net s.1., <br />including 1,700 square feet of office/showroom space, is not adequate. Based on <br />the City Code requirements, 31 spaces are required. <br /> <br />1,700 s, 1. of office and showroom @ 5 spaces per 1,000 = 8 spaces <br />6,800 s, 1. of manufacturing @ 4 spaces + 1space/800 s,f = 12.5 spaces <br />In manufacturing space, 1 space is allotted for each employee = 10 spaces <br /> <br />At the September Planning Commission meeting, the lack of parking on site was <br />discussed at length. The Commission also discussed the need to include the <br />northern (residential) parcel of the Schreier's in the PUD in order to provide <br />adequate area for parking if there was a change in occupancy or operation of the <br />business. <br /> <br />3.4 The site is currently served by municipal utilities. Since the impervious surface area <br />will increase with the expansion of the off-street parking area, storm water detention <br />must be developed on the site. <br /> <br />3.5 Engineering staff review of the proposal indicates that no additional roadway <br />dedication or easement is required for Cleveland Avenue in accordance with the <br />Ramsey County master street plan. <br /> <br />3.6 With the proposed change in use, the number of trips is expected to increase, The <br />number of trips (in or out of the site) generated by 6,800 square foot light industrial <br />use (2.0 to 3.5 trips/employee) is estimated at 20 to 35 trips a day. The number of <br />trips generated by a net 1,700 square foot showroom/office center is 30 - 40 trips <br />per day (Institute of Transportation Engineers). The 1997 average daily traffic count <br /> <br />PF#2986 - (10/26/98) - Page 5 of 10 <br />