Laserfiche WebLink
<br />entrance. Because of the joint use of the site for both church and senior housing uses, <br />rezoning of the site is to a mixed use Planned Unit Development. Since the highest use is <br />the senior housing building, the underlying zoning will need to be high density residential <br />(churches are allowed as a permitted use in most residential zoning districts). The <br />Comprehensive Plan will also need to be amended to change the future land use <br />designation of the church site from Church to High Density Residential and the Huberty <br />site from Low Density Residential to High Density Residential. <br /> <br />2.3 The senior housing facility as proposed includes 56 units on three floors, with a heated <br />underground parking garage with one space for each unit and an elevator serving each <br />floor. Combined with surface parking, 71 parking spaces are proposed. The exterior of the <br />building as proposed is pre-finished lap siding with face brick wainscoting and asphalt <br />shingles. The building will include a dining/lounge area, a guest room, and a terrace on <br />the main level. There will be 12 one-bedroom unit, ranging in size from 748 square feet to <br />994 square feet, and 44 and two-bedroom units, ranging in size from 908 square feet to <br />1342 square feet. All units will have a deck or patio, as well as a washer and dryer. The <br />selling price per share in the cooperative will range from $25,000 to $50,000, with the <br />monthly housing expense ranging from $600 to $1100. <br /> <br />2.4 The Planning Commission held a sketch plan review of this request on July 8,1998. At this <br />meeting, the overall project was presented and two alternative site plans were reviewed. <br />In one site plan, the senior housing building was located in the southeast portion of the <br />site. In the second site plan, the senior housing building was located in the northwest <br />portion of the site. The senior building at this time was proposed as a 60-unit four-story <br />building with a 56 space underground parking garage. The height and bulk of the building <br />were discussed, as well as the impact of the building on the park and adjacent properties. <br />The Planning Commission asked for more architectural detail on the structure, a visual <br />analysis that clarifies the visual impacts of the property on the park and adjacent <br />properties. The Planning Commission also expressed a preference for the site plan <br />that placed the building in the northwest portion of the site and asked the applicant <br />to meet with the Park and Recreation Commission to review the impacts of the <br />project on Central Park, both pro and con. <br /> <br />2.5 The Park and Recreation Commission reviewed the request on August 4, 1998. The <br />Commission expressed a preference for the site plan that places the senior housing <br />building in the northwest portion of the site (current proposal). The Commission also <br />expressed concerns with the impact of the structure on the park, the need to retain as <br />much existing vegetation as possible, a preference for a shared parking area with the park, <br />and a preference to construct only as many parking church spaces as actually needed at <br />this time. <br /> <br />2.6 The Planning Commission held a second sketch plan review of this request on August 12, <br />1998. The plan presented at this meeting showed the senior housing building placed in <br />the northwest corner of the site and reduced the size of the senior building to 56-units and <br />three stories (current proposal). A height comparison was also presented which showed <br />that the peak of the roof of the senior housing building was approximately three feet <br /> <br />PF3049 - RPCA (01/13/99) - Page 3 of 8 <br />