Laserfiche WebLink
<br />2. Water Supply/Management Plan 11/96 (Section 10) - Reviewed and approved by <br />the Metro Council 3/28/97. <br /> <br />3. Interim Strategy to Reduce Non-Point Surface Water Pollution Management Plan <br />(Section 8) - Reviewed and approved by the Metro Council Memo 12/28/96. <br /> <br />4. Existing Land Use Map(Section 4) - Illustrates existing land uses, including a <br />spreadsheet breakdown of each designation by area and percent of total City land <br />area. (map attached) <br /> <br />5. Comprehensive Plan Future Land Use Map (Section 4) - Illustrates all future land <br />use designations based on City approvals to December 14, 1998, including a <br />spreadsheet breakdown of each designation by area and percent of total city land <br />area. (map attached) <br /> <br />6. Zoning Map (Section 4) - Illustrates all land use zoning designations based on City <br />approvals to December 14, 1998, including a spreadsheet breakdown of each <br />designation by area and percent of total city land area. (map attached) <br /> <br />7. Pathways Network Master Plan (Section 9) - A new plan and map(s) has been <br />produced which indicates on and off-road pathways. The Pathways Committee <br />has completed its report, and the Commission and Council approved it. <br /> <br />8. Parks and Open Space Infrastructure Plan (Section 9) - The Infrastructure <br />Committee has completed its report and the Commission and Council approved <br />it. The report was adopted by reference as part of the Comprehensive Plan. <br /> <br />9. Livable Communities Program 1998-99 (Section 6) - Housing Goals were adopted <br />by the City Council and sent to the Met. Council for approval in November 1998. <br />These goals are attached and should be adopted as a part of the Comprehensive Plan. <br />(narrative attached) <br /> <br />10. Cornerstone Plan (Section 6) - While the map and report was completed indicating <br />that there were 29 potential intersections for this neighborhood redesign effort, the <br />architectural design concepts and the design guidelines were not completed. While <br />three projects are underway (one at each comer), only the map and the report can <br />be approved as part of the plan at this time. <br /> <br />PF 3082 - RPCA (11/18/98) - Page 2 of 4 <br />