Laserfiche WebLink
<br />City's Development Review Committee, under the direction of the Community <br />Development Director. However, any substantial departures from the approved site <br />plan will require another amendment to the planned unit development. <br /> <br />2. Final grading, storm sewer, utility plans and driveway alignment plans must be <br />reviewed and approved by the City Engineer/Public Works Director. Since the <br />impervious surface on the site will increase, the applicant will need to contact the <br />Rice Creek Watershed District for permit requirements. A final landscape plan must <br />be submitted to the City Landscape Architect for approval. <br /> <br />3. The erosion control plan must be submitted in conjunction with site development. <br /> <br />5.0 PLANNING COMMISSION RECOMMENDATIONS <br /> <br />On January 13, 1999, the Planning Commission held the required hearing and received <br />comment from the public. After discussion of the issues (see attached excerpt from the <br />draft minutes), the Planning Commission recommended approval of the proposal (7-0), <br />citing the comments and findings in Section 3 and the recommendation in Section 4 of <br />this report. <br /> <br />6.0 SUGGESTED COUNCIL ACTION <br /> <br />6.1 By motion, approve of the request to amend the boundary of College Properties/EagleCrest <br />PUD to add approximately 1.2 acres in order to increase the size of the Country Inn and <br />Suites building to allow for a three story addition, consistent in design and materials with the <br />existing building, within which 24 more lodging units and a restaurant will be constructed, <br />based on the findings outlined in Section 3 of this report and with the conditions outlined in <br />Section 4 and the Planning Commission recommendation within Section 5 of this report. The <br />effective date of the amended PUD will be after submission of all revised documents, final <br />approvals, signings of the amended agreement, and publication of the amended PUD <br />ordinance. <br /> <br />Attachments: location map; notification map; notice of public hearing; approved master site plan (1993); master site <br />plan showing modified building on this parcel; site plan; grading, drainage, erosion control & utilities plan; landscape <br />plan; building floor plan; building elevations and city engineering review (01/04/99). P.c. draft minutes from 1/13/99 <br />meeting. <br /> <br />60-day Time Limit: application submitted on 12/14/98; application accepted as complete on 12/14/98; concept decision <br />deadline is 02/14/99. Final action on a PUD is considered a separate 60-day review after concept approval. <br /> <br />Prepared by: Dennis Welsch (490-2232) <br /> <br />Q:\Community Development\Planning Files\PF3094\PF3094-RCA(O 12599),doc <br /> <br />PF#3094 - RCA (01/25/99) - Page 4 of 4 <br />