Laserfiche WebLink
<br />3.9 The two access points along Lincoln Drive shall be eliminated and curb and <br />gutter replaced according to City specifications. In addition, the access point <br />along County Road C2 shall align with the temporary median cut in County <br />Road C-2. <br /> <br />3.10 The development's retaining wall, proposed on the northwest side of the <br />addition, should include a design and materials detail. These items should be <br />included within the final plan set that is reviewed and approved by staff prior to <br />recording of the PUD agreement. <br /> <br />3.11 The applicant should submit appropriate information to the City Engineer to <br />determine whether additional storm water ponding is necessary. The applicant <br />is also required to provide the City Engineer with proof that the project has been <br />reviewed and approved by the Rice Creek Watershed Management <br />Organization. <br /> <br />3.12 Building elevations are inconsistent when reviewed against the proposed floor <br />plans. These documents should be revised to be consistent with one another <br />and specify design and materials at each building face. <br /> <br />An executed copy of ordinance #1226 is enclosed. If you have any questions, please call <br />me. <br /> <br />Sincerely, <br /> <br />Thomas Paschke <br />City Planner <br />City of Roseville <br />