Laserfiche WebLink
<br />. <br /> <br />e' <br /> <br />. <br /> <br />.JUL-,,:::::J-l";f':!':j l~;~ <br /> <br />LilY ur MINNCIUNKH <br /> <br />612 939 8244 <br />,,"vr"'li...~ vn1.JII"4~I"\';1: <br />SECTION 300.27 <br />PAGE 200 <br /> <br />P. 13/16 <br /> <br />d) <br /> <br />location. approximate size and common name of existing trees and shrobs; <br /> <br />a planting schedule containing symbols, quantities, common and botanical names, size <br />of plam materials, root condition and special planting instructions; <br /> <br />t) planting details ilJustrating proposed locations of a~ 'new plant material; <br /> <br />e) <br /> <br />g) Jocations and details of other landscape features including berms. fences and planter <br />boxes; <br /> <br />h) details of restoration of disturbed areas including areas to be sodded or seeded; <br /> <br />j) location and details of irrigation systems; and <br /> <br />j) details and cross sections of all required screening. <br /> <br />SUBDIVISION 15. MINIMUM LANDSCAPING REQUIREMENTS. <br /> <br />a) <br /> <br />. - <br />All open areas of a lot which are. not used or improved for required parking areas. <br />drives or storage shall be landscaped with a combination of overstory trees, <br />understory trees. shrubs, flowers and ground cover materials. The plan for <br />landsca.ping shall include ground cover, bushes, shrubbery. trees, scu1pmre, <br />foundations. decorative walks or other similar site design features or materials in a <br />quantity having a minimum value in conformance with the .following table: <br /> <br />FROJEer VALUE <br />INcLUDING BUILDING CONSfRUCTION, <br />SITE PREPARATION, AND SITE IMPROVEMEl\"J'S <br /> <br />MINIMuM <br />LANDSCAPE VALUE <br /> <br />Below $1,000,000 <br /> <br />- <br /> <br />2% <br /> <br />51,000,001 - $2,000.000 <br /> <br />- <br /> <br />$20,000 + 1 % of <br />Project Value in <br />excess of <br />$1,000.000 <br /> <br />$2.000,001 - $3.000,000 <br /> <br />- <br /> <br />530,000 + 0.75 % <br />of Project Value <br />in excess of <br />$2,000,000 <br /> <br />$3.000,001 - $4,000,000 <br /> <br />. <br /> <br />- <br /> <br />$37,500 + 0.25% <br />of Project Value <br />in excess of <br />$3,000,000 <br /> <br />Over $4,000.000 <br /> <br />- <br /> <br />1% <br /> <br />( <br />