My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03159
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3100
>
pf_03159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:49:03 PM
Creation date
12/8/2004 3:56:00 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Received: 8/ 2/00 13:48; <br /> <br />612 252 9077 -> City of Roseville; <br /> <br />Page 2 <br /> <br />08/~2/2000 WED 13:44 FAX 612 252 9077 LANDFORM ENGINEERING CO <br />. 10 <br /> <br />I4J 002/004 <br /> <br />Apr-11-00 15:~3 P.03 <br /> <br />HURST & ASSOCIATES CONSULTING ENGINEERS <br /> <br />SOB H1\.I.WOOD AVENUE. FALLS CHU~. VIRGINIA 22046 <br />tELEPHONE: 703-53-4.7872 <br />FACSIMILE: 7~e..397D <br />E-MAIl.: IooINr.arnnSltlt,ccm <br /> <br />C1YDE G. HURsT. pJ!. <br />Cl'fOf: G. HUAsT III. P.E. <br /> <br />Date: April 11, 2000 <br /> <br />Landform Engineering Company <br />510 First Avenue North, Suite 650 <br />Minneapolis, MN 55403 <br /> <br />Attention: Jeffrey A.S. McDonnell <br /> <br />Re: Sunrise Assisted Li\fing <br />Roseville, MN 99164 <br /> <br />Dear Mr. McDonnell; <br /> <br />Enclosed are copies of a preliminary load letter. The elecotrical source requested for the <br />project is a 3000 Amps, 3 phase, 4 wire. 120/208 volt secondary service fed by a Power <br />Company supplied pad mounted transformer secondary lateral. <br /> <br />The main incoming electrical service shall be underground. The main incoming electrical <br />service equipment (Switchgear) will be rated 100,000 AIC. <br /> <br />This is B prototype electrical design. The exact elecbicalload information will be <br />cornpleted at a later time, and we will Include the latest utility site plan and electric room layout <br />for your revIew. We need your assistance in providing us the Power Company requirements as <br />needed to complete the electrical design for permit 8nd bidding documents. <br /> <br />1. The enclosed Site Plan indicates a proposed pad-mounted transformer. We need <br />confirmation that the location meets the Power Company requirements. <br /> <br />2. We need the Power Company requirements that the Contractor is required to provide and, <br />the following Information: <br />a. My right-of-way Issue for the proposed site? <br />b. Primary service, underground. <br />c. Transformer and pad detail. <br />d. Secondary service, undergfO",nd. <br />e. Metering cabinet, meter base location. <br /> <br />Please advise tf the Owner is required to do any primary work off the property. <br /> <br /> <br />an Lao <br />Hurst & Associates <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.