My WebLink
|
Help
|
About
|
Sign Out
Home
2014-10-07_PR Comm Packet
Roseville
>
Commissions, Watershed District and HRA
>
Parks & Recreation
>
Parks & Recreation Commission
>
Packets
>
2014
>
2014-10-07_PR Comm Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2014 4:25:06 PM
Creation date
10/8/2014 4:25:02 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
52is hoped that the Climbing Rock will be installed in time to coincide with the <br />53opening of the new park building this fall. <br />54D. Holt inquired into how the Best Value Process has been working. <br />o <br />55Brokke responded that so far the process is working good and has brought <br />56contractors together, as it should.It is new to all so will continue to <br />57evaluate. <br />58Playgrounds at Howard Johnson, Langton Lake @ County Road C2 and Materion Parks <br />59Brokke shared pictures from the community celebrations at each park recognizing <br />o <br />60the completion of the playgrounds. <br />61Tennis Court Renovation <br />62Work has begun on the courts at Howard Johnson and Pocahontas Parks. These <br />o <br />63court projects will be using a process that reclaims some of the court surface for <br />64the base of the renovated courts. <br />65County Road B2 Sidewalk <br />66Concrete has been poured from Lexington to Victoria. <br />o <br />67Skating Center Exterior Painting & Improvements <br />68Contractor has been secured and exterior painting is expected to take place in late <br />o <br />69August. <br />70Nature Center <br />71Work has begunon the exterior. <br />o <br />72Boardwalk is currently being built off-site and will be installed this fall and winter. <br />o <br />73Lake Bennett Lighting <br />74Work will begin toward the end of August. <br />o <br />75Field Improvements at Evergreen Park and Central Park Victoria <br />76Work is scheduled to begin next month on 2 fields at Evergreen and 4 fields at <br />o <br />77Central Park. <br />78Disc Golf Improvements <br />nd <br />79First nine holes will be worked on this fall with the 2nine being completed in the <br />o <br />80spring. <br />81Natural Resources <br />82Contractor working on additional grants to help expand Renewal Program funding <br />o <br />83for Natural Resource projects. <br />84Irrigation Improvements <br />85Staff will being bringing this package back to the Council at an upcoming meeting <br />o <br />86due to the selected contractor not being able to work out an agreement because <br />87they were not able to secure the required 3-year bond. <br />88 <br />CONSIDER TOUR in SEPTEMBER <br />896. <br />90Commission agreed to adjust their traditional meeting night to Wednesday, September 10 and <br />91meet earlier at 5:30pm to accommodate their annual park tour. <br />92 <br />STAFF REPORT <br />937. <br />94Anfang reportedon recent communication efforts: <br />95Shared a draft copy of the sign that will be posted at each park building site. Sign will <br />96include sketch of building exterior, floor plan, contact information and web location for <br />97more information. <br />98Social Media Update. Recent Facebook posts have received good response and are <br />99demonstrating the potential to reach a strong number of community members. 2 posts <br />100added between July 31 & August 2 had reached over 1350 people. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.