Laserfiche WebLink
<br />. ~7/08/93 13:54 <br /> <br />V612 337 5601 <br /> <br />DSU. INC. <br /> <br />III 007/009 <br /> <br />R.ick 30pke <br /> <br />7/8/93 <br /> <br />JiIIage , <br /> <br />City will agree, in the Development Agreement, to maintain the <br />pipes, but the adjacent owners will be responsible for mowinq or <br />other aesthetic maintenance of the ponds. <br /> <br />17. 2'ha't the applicant be encouraged to increase evergreen <br />materials. <br /> <br />We believe the revised landscape plan Is adequate and has a <br />reasonab~e mix of evergreen and deciduous plant materials. <br /> <br />0" ~8 . !'ha't 'there be st:.rong architectural contlnu1 'ty ~or tbe entire <br />project. staff should review all future development to ensure <br />that continuity is maintained. <br /> <br />The two senior housing buildings are not identical in architectural <br />atyle and were never intended to :be, :but there is a strong <br />architectural continuity in materials, massing, and roof slopes. <br />For the Assisted Living. buUdinq. (the.. sma111=!1: Qf. the.. tw.ol t'..he.. <br />material are brick, stucco, pre.f!nished siding, and shinqle roof. <br />The Independent Living building will be brick and EIFS (stucco) <br />with standing seam metal roofs. <br /> <br />The motel building was presented in the submitted plans as all <br />steel lap siding. We have insisted that it include brick in is <br />similar fasbion to the Independent Living building - all the way <br />around on the ~ower level and extendinq up to the roof at key <br />massings. The applicant has agreed to discuss this with the motel <br />franchiser. <br /> <br />19. i'hat the rinal exterior materials and colors be submitted Lor <br />Council considera:tion as part of the tinal development plan. <br /> <br />The applicant will have meterial sample5 at the city Council <br />meeting on July 1~. <br /> <br />20. That progress be demonstrated on correctio.n to the soil <br />erosion problems adjacent to the main campus as part of the <br />final PUD plan approval. <br /> <br />The Public Works Department indicates that substantial progress has <br />been made on the soil work noted and that the COllege has <br />cooperated in good faith to correct the problems. <br /> <br />21. f'hat the approval.s are contingent u.pon submittal OL the <br />Comprehe.n.sive Pl.an. AmendlJlent to the lfetropolitan Council. <br /> <br />The project complies with this condition, since the Camp Plan <br />amendment. has been submitted to the Met council, but they have not <br />yet approved it. The Met council staff is askinq the City to adopt <br />