Laserfiche WebLink
<br />I also concur with the DRC conditions attached to the permit regarding the <br />need for roof gutters, the need for a detailed grading plan to take water to the <br />street where possible; a lot and setback survey; meeting the lot coverage <br />requirements of 30%; and submission of a landscape plan which illustrates <br />what will be disturbed and how it will be mitigated or replaced. <br /> <br />I am confident you will abide with that decision. You had given the city <br />those assurances during the DRC process that you will comply with the <br />conditions of the Setback Permit. <br /> <br />Thanks for your cooperation. If there are questions, feel free to contact me <br />or our city planner, Thomas Paschke (651-490-2236). <br /> <br />Sincerely, <br /> <br />CITY OF ROSEVILLE <br /> <br />~ YWd-scL-- <br /> <br />By: Dennis P. Welsch, (651-490-2232) <br />Community Development Director <br /> <br />Xc: Thomas Paschke, City Planner <br />Joel Jamnik, City Attorney <br />Neighbors attending the DRC Hearing <br /> <br />Q:ComDev/zoning code and letters/Cheney <br /> <br />2 <br />