Laserfiche WebLink
<br />6.0 POLICY (Comprehensive Plan Consistency) & FISCAL IMPLICATIONS: <br /> <br />· Chapter 3, Section IV of the Roseville Comprehensive Plan encourages redevelopment <br />and clear-up of outdated commerciallindustrial buildings and properties. <br /> <br />· Planning District 10 and the Tower Place Master Plan encourages a diversity of <br />redevelopment uses. <br /> <br />6.3 Increase in Market Value: The Community development Staff has estimated that the market <br />value of the two proposed developments will more than triple the properties current $460,000 <br />market value. <br /> <br />6.4 Jobs: The applicants have determined that Abra will employ 20 to 25 people, 95% of whom are <br />full time employees who earn $20,000 to $80,000 per year, with over half the employees <br />earning over $50,000 per year. The Casci development will retain the 5 existing employees. <br /> <br />7.0 PROJECT IMPACTS/CONDITIONS: <br /> <br />7.1 Daily vehicle counts on County Road Care 16,000, with an anticipated volume of 17,300 by <br />2010 and 18,700 by 2020. The applicant has estimated that the Abra facility will have a peak <br />hour volume of26 trips and a daily movement of224 vehicles. Staff has estimated the Casci <br />site will have an average daily traffic volume of 20 to 30 vehicles and a very limited peak hour <br />movement. <br /> <br />7.2 On-site parking for the Abra development is well in excess of the Code requirement. The City <br />Planner has determined that the Abra site will have a parking requirement of 14 spaces for the <br />office component (2,800 sq. ft. @ 5/10000) and a parking requirement of 15 spaces for the <br />preparation/repair area (15,150 sq. ft. @ 1/1000), for a total requirement of29 spaces. The <br />current Abra site plan indicates 108 parking spaces. The Community Development Staff is <br />concerned that the site is over designed with parking spaces and that there will be a number of <br />vehicles parked over night, which "storage" is opposed by Staff. The City Planner would like <br />to work with Abra to understand their parking needs and ways to reduce the amount parking lot <br />area on the site. <br /> <br />7.3 The City has determined that the 12 on-site parking spaces indicated for the Casci site is <br />adequate; however, in the event that the property/structure is sold and the office/employee size <br />increases beyond the current 5 anticipated, that use would require additional on-site parking <br />spaces. Given this concern, the City Planner recommends that a cross parking easement and <br />proof of parking agreement be created between the Abra site and the Casci site, which <br />easement will be based on the final parking plan. <br /> <br />7.4 The storm sewer catch basin indicated within the fenced storage area at the rear of the Abra <br />structure must contain a flammable liquid/petroleum trap to catch and/or slowdown potential <br />contamination to down stream storm water management ponds, and later, Langton Lake. <br /> <br />7.5 Because the Casci parcel does not have direct access to a public street the City will require that <br />a shared access easement be created affording perpetual vehicular access within the proposed <br />drive lane to the rear parcel. <br /> <br />PF3448 - RPCA Concept Plan - 030503 Page 4 of 6 <br />