Laserfiche WebLink
<br />a. the operator's right to possession of the premises for the purpose of <br />conducting the interim use is dependent upon the interim use permit <br />having been granted and maintained in full force and effect; and <br /> <br />b. the operator's right to possession of the premises for the purpose of <br />conducting the interim use will terminate upon any expiration or <br />revocation of the interim use permit; and <br /> <br />c. it shall be the responsibility of the owner to terminate the operator's <br />possession of the premises upon any expiration or revocation of the <br />interim use permit if the operator continues to utilize the premises for the <br />conduct of such interim use. <br /> <br />2. Each permittee shall be jointly and severally liable for all costs and expenses, <br />including attorneys' fees, the city may incur to enforce the conditions of the <br />interim use permit upon any breach thereof by the permittee, or to abate and <br />remove the interim use upon any failure by the permittee to discontinue such use, <br />or to evict the operator of such use, upon the expiration or revocation of the <br />interim use permit. <br /> <br />3. The applicant/property owner agrees to complete fire, life safety, and codes <br />inspection of the proposed use with the city fire and building inspectors. The <br />applicant shall provide a scaled property survey and development plan illustrating <br />all property lines, buildings, paving, ponding, grading, compacted gravel surfaces, <br />fencing, lighting, landscaping and/or screening, and setback dimensions. A Rice <br />Creek Watershed Permit may be necessary and is the responsibility of the <br />applicant prior to applying for grading and/or building permits from the City of <br />Roseville. <br /> <br />4. The building shall be used (after approval of this interim use permit) exclusively <br />for seasonal and peak period truck and trailer parking and storage without <br />expansion of the building or the existing paved surfaces; or the building shall <br />revert to a permitted use within the underlying B-6 zoning district. The building <br />shall have a maximum capacity and use for _ peak or seasonal parked or trucks <br />at anyone time. The interim use shall be for five years and be reviewed <br />administratively each year on or around the anniversary date of approval of the <br />permit. <br /> <br />5. Within 180 days of permit approval, the applicant shall complete all proposed and <br />required on-site improvements. The applicant shall remove all construction and <br />other debris from the site prior to occupancy or within 180 days whichever comes <br />first. <br /> <br />6. The parking area shall not be expanded in size or intensity from that approved by <br />this permit. All permitted interim uses shall be restricted to space within the <br />proposed site and parcel. <br /> <br />3 <br />