Laserfiche WebLink
9/28/2015 <br />SRF Consulting Group, Inc. <br />Client: CITY OF ROSEVILLE <br />Project: TERRACE LANE AT LINCOLN LANE REALIGNMENT, LINCOLN LANE TO <br />SNELLING AVE REALIGNMENT; SIGNAL MODIFICATION AT SNELLING <br />AVENUE <br />TASK N0. TASK DESCRIPTION <br />2.1 Survey <br />Perform limited topographic survey in areas of proposed roadway improvements <br />at Terrace/Lincoln intersection and Lincoln/CR C2/Snelling intersection. <br />2.2 Base File Mapping <br />Resource and supplement base mapping for project using survey, City CAD files <br />and LIDAR to create base mapping for project delivery. <br />2.2 UtilityCoordination <br />Set up an initial Gopher State One Call (GSOC) for the project area <br />2.3 Review received utility as-builts <br />- Compile as-built information into project basefiles and planset. <br />2.3 Arrange, prepare, attend and facilitate two utility coordination meetings as <br />required by Minnesota Statute <br />2.4 Place verification ticket WITH GSOC withinn 90 days of bidding. <br />SUBTOTAL-TASK 2 <br />3.0 PRELIMINARY DESIGN <br />Assumptions: <br />- The intent of the 30% plan is to get staff consensus of all project elements. <br />Hours included plan inclusion of water resources and signals are for <br />coordination only and are in addition to hours stated in related tasks of those <br />designs. <br />The project will need to comply with the Rice Creek Watershed District and the <br />MPCA's NPDES permit <br />HydroCAD will be utilized for hydrologic and hydraulic modeling of storm water <br />BM Ps. <br />Assume proposed storm sewer can connect to existing storm sewer trunklines. <br />No analysis of the existing trunk line is included. <br />- Assume one BMP is needed to meet permitting requirements. Stormwater <br />credits may be applied if no available ponding sites are available. Hours shown <br />will be used to coordinate and document use of the credits. <br />- A preliminary drainage design report will not be required. Significant issues will <br />be noted on existing or proposed drainage area maps. Computations will be <br />pravided for review. <br />Client Deliverables: <br />- Timely response to design decisions and review of submittals. <br />Work Tasks and Person-Hour Estimates �� �� � <br />Consulting Group, Inc. <br />P14 XXXX <br />PRINCIPAL SR. ASSOC. ASSOCIATE SR. PROF PROF. TECHNICAL CLERICAL TOTALS EST. FEE <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />8 20 <br />0 <br />0 <br />0 <br />0 <br />0 <br />8 <br />0 <br />0 <br />0 <br />0 <br />0 <br />20 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />20 <br />4 <br />4 <br />6 <br />1 <br />35 <br />0 <br />10 <br />0 <br />0 <br />0 <br />0 <br />10 <br />Page 3 of 13 <br />0 28 $3,504 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />30 $3,120 <br />4 $344 <br />4 $344 <br />6 $516 <br />1 $86 <br />73 $7,914 <br />LWCOLN-SNELLING 2-Hrly_Tasks.xlsx <br />SRF CONSULTING GROUP, INC. ENGINEERS AND PI.ANNERS MINNEAPOLIS. MN <br />