My WebLink
|
Help
|
About
|
Sign Out
Home
2016-01-26_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2016
>
2016-01-26_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2016 3:00:49 PM
Creation date
1/21/2016 2:16:35 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
1/26/2016
Commission/Committee - Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1-35W between Hwy 36 and 1-694 <br />Roseville, Arden Hills, New Brighton <br />About this project <br />- Project area <br />Work will include repaving 1-35W between Hwy <br />36 and 1-694. <br />Repaving the road will extend the life of the <br />pavement and provide a smoother, safer <br />surface for motorists. <br />Cost <br />• $1 million (estimate) <br />Schedule <br />• Construction begins 2016 <br />Location <br />• Between Hwy 36 in Roseville and 1-694 in Arden <br />Hills and New Brighton <br />Benefits <br />• Smoother road <br />• Extends the life of the pavement <br />• Increases capacity <br />
The URL can be used to link to this page
Your browser does not support the video tag.