Laserfiche WebLink
1-35W between Hwy 36 and 1-694 <br />Roseville, Arden Hills, New Brighton <br />About this project <br />- Project area <br />Work will include repaving 1-35W between Hwy <br />36 and 1-694. <br />Repaving the road will extend the life of the <br />pavement and provide a smoother, safer <br />surface for motorists. <br />Cost <br />• $1 million (estimate) <br />Schedule <br />• Construction begins 2016 <br />Location <br />• Between Hwy 36 in Roseville and 1-694 in Arden <br />Hills and New Brighton <br />Benefits <br />• Smoother road <br />• Extends the life of the pavement <br />• Increases capacity <br />