Laserfiche WebLink
�� <br />� <br />� <br />� <br />� <br />� <br />i <br />, <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />from west of Fairview Avenue and to carrv this drainage to County Ditch 4 which traverses the <br />A11ied Stores' propert� and i� indicated on this drawing. East of and abutting County Ditch <br />4�storm sewers wauld b:G required to intercept a law point in the road�ay and to carry the <br />runoff from this location in a westerly dir�ction to County Ditch �4. The 60" arch gipe indi- <br />cated on this drawing is nece,9sary to convey th� rvnoff from 350 acres carr�.ed by County Ditch <br />#4 from the south throug�s the roadway embanlanent. <br />Drainage plans for tlie Minnesota Highway Department inteichange of County Road "B-2" and T. <br />Ii. #S1 have not been co�summated at this date. Haw�ver, it rs understood that the interchange <br />low point wfll be drained at an easterly direction to �iQunerm,an Lake. <br />Drawing No. 7 indica�es the storm sewers required if only the roadway facility between Fair- <br />view Avenue and HaIInline Avenue were to be constructed. Z`his r�port will show �,n �ubsequent <br />se��:io�rs how the systern necessary for roadwag► drainage should be combined with those systems <br />necessary fox Allied Stores drainage and .for District 6W drainage ta form an integral storm <br />sewer system for the area. <br />Storm Sewers for Countv Road "B-2" froffi T�unk Hi�hwav ��51 to Hamline Avenue: <br />S�orm sewer cQastruction for County Road "B-2'" east of Trunk Highw�y �51 w�i.11 be facilita.ted <br />by the existence of two storm sewers in this urea. The first of these storm s�wers is the <br />stor�m sewer constructed on Si.mgson Street jo3ntly by the Vi�lage and Minnesota llepartment of <br />Highways as a storm �water control for Zimmerman Lake. Ttae over£low structure whic�i was a <br />part af this improvement will have to tse reconstructed in view of proposed roadway Ioca.tion. <br />This work is w�thin the Sta�te portion of the roa�way construction. On the Village section it <br />is recom�mended that appraxim�t�ly 300 liseal feet of 1Z in�h storm sewer be constructed to <br />connect to the Si�mpson Street storm sewer to drain the intersection of the Frontage Road and <br />Pascal Street and to intercept drainage on County Road "B-2" at this same location, <br />Ttie secon�i of the two er.isting s�:orm sewers in this location begins at the intersection of <br />County Road 'iB-2" a�d �amline Avenue and drains in an easterly direction to tT�.e pon.d just aarth <br />�� of the Ale�ander Ramsey High School. Only minor modifica.tion of this storm sewer will be re- <br />�: <br />quired i.n order to intercept storm drainage waters from County Road "B-2" and Hamline Avenue <br />. " -�.�L- <br />