Laserfiche WebLink
' <br />� <br />� <br />ENGINEER entitles him to an increase in the Contract Price, he may make a claim <br />therefor as provided in Article 21, <br />20,3 Additional work performed by the CONTRACTOR with t th <br />ou au orizat�an of a Change <br />Order wi11 not entitle him to an increase in the Contract Price or an extension <br />� of the Contract Time, except in the case of an emergency as provided in Article <br />18.2. and except as provided in paragr�aphs 16,1., 19�2, and 20.2.. <br />� <br />' <br />20e4 The Ol�1NER will execute an appropriate Change Order prepared by the ENGINEER <br />covering chanqes in the l�lork to be perfo►,med as provided in paragraph 11.3., and <br />work performed in an emergency as provided in paragraph 18.2.2 and any other <br />appropriate claim of the CONTRACTOR for a change in the Contract Tin�� or the <br />Contract Price which is approved by the ENGIPdEER. <br />20.5 It is the CONTRACTOR'S responsibility tc notify his Surety of any changes <br />� affectinct the general scope of the l�lork or change in the Contract Price and the <br />amount of the applicable bonds shall be adjusted accordingly. The CONTRACTOR <br />wi 11 furn� sh proof of such ad justment to the 04JNER. <br />� ARTICLE 21 - CHANGE OF CONTRACT PRICE <br />2i.1 The Contract Price constitutes the total compensation payable to the <br />� CnNTRACTOR for perform�ng the Wo�k, All duties, re �onsibilities and obligations <br />assigned to or undertaken by the Ob!NER shall be at his expense without char�ge <br />in the Contract Pric�- <br />� <br />!�.J <br />� <br />21.2 The Contract Price may only be changed by a Change Order� If the CONTRACTOR <br />is �ntitled by the Contract Documents to make a claim for an increase ir� the <br />Contract Price, his claim shall be delivered to the OWNER and the ENGINEER, in <br />writing, wi�hin 15 days of the occurrence of the event giving rise to the claim. <br />All claims �or adjustmen�s in the Contract Price shall be determined by th� <br />ENGI�VEER if the OWNER and CONTRACTOR cannpt otherwise agree on the amount <br />involved under �h� procedure of Artiele 14. Any change in the Contract Price <br />resultinc� from any such claim sha�l be incorpor�ated in a Change Order. <br />21.3 Th� value of any l�lor�k covered by a Change Order or of any claim for an <br />� �ncrease or decre�se in the Contract Price shail be det�rmined in one of the <br />follow�ng ways: <br />� 21 ,3.1 . 4�Jhere the !�;ork involved is covered by uni�t prices contained <br />in the Contract Documents, by application of unit pr�ces to <br />the quant�ties ofi t.he items involv�d. <br />� <br />� <br />� <br />� <br />21.3.2. <br />21.3.3. <br />By mutual acceptanc:e of a lump su�T�. <br />Qy cost and a rnutually acceptable fixed amount for overh�ad <br />anci prof i t � <br />G - 13 <br />' <br />�� <br />' ��;' <br />