Laserfiche WebLink
• itOBEVILLE PLAATNING OFFICE HOURS 7/24/91 <br />2, Jim Price, Saturn (483-9106) <br />Dennis Ward, SEH (490-2000) <br />L� <br />� <br />2 <br />The Saturn people have drawn a detailed site plan for their <br />proposed auto dealership on the southern portion of the Mack parcel <br />at Long Lake Road and County Road C-2. The plan assumes the <br />vacation of the north half of C-2 right-of-way for the site, which <br />is reasonable. <br />Although carefully designed, the plan is very tight on the site and <br />some of the required setbacks were not met. 3'he suggested lot line <br />between this proposed new site and the remainder of the Mack <br />property also has a jog in it to accommodate existing Mack parking <br />and new Saturn customer parking. Needing to create this awkward <br />lot line is another example of how tight the use is being fitted <br />on the site. <br />We indicated we were still supportive of the rezoning for this use <br />and were sympathetic to the requirements of the new Saturn <br />facility, but could not see a hardship with the site that would <br />enable us to support the variances being shown. <br />3. Jim Bergstrom, Liberty Bank (786-7455) <br />Mike O'Brien, Sullivan Realtors (646-8646) <br />Liberty Bank has taken possession (by default on a loan) of the <br />office building at 2353 Rice Street, on the corner of Rice and <br />Grandview. The lot fronts both Rice and Woodbridge south of <br />Grandview. In an effort to make the property more attractive to <br />a prospective buyer, the Bank is proposing to split off a portion <br />of the site fronting Rice Street as a separate vacant lot to be <br />sold for a future commercial user. The existing building has about <br />23,000 square feet, of which almost 18,000 square feet are net <br />rentable. There are currently 85 parking spaces on the entire <br />site, which appears to conform to ordinance parking standards. <br />The property is zoned B-2 and a lot split for another commercial <br />use would be appropriate, but the existing building cannot afford <br />to lose any of its parking spaces and still be used for office <br />space. The plan they proposed showed only 59 spaces on the lot <br />that remains with the building, even with an additional 20 spaces <br />being proposed for an area that is currently green space. <br />We said we could not support the proposal as currently configured, <br />but invited them to consider options that would allow the property <br />to include more commercial space, such as converting a portion of <br />the existing building to other uses or adding on to the building. <br />It appears that splitting off a portion of the lot for a separate <br />use may not be feasible on this site. <br />