My WebLink
|
Help
|
About
|
Sign Out
Home
Correspondence 1985-1989 Dahlgren
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
1983-1993 Correspondance and Office Hours Records
>
Correspondence 1985-1989 Dahlgren
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2016 8:56:49 AM
Creation date
2/9/2016 12:57:20 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />� <br />� <br />Office Hours � <br />April 2, 1986 <br />2 � <br />April 7, 1986 <br />Charlie Honchell showed Mr. Barrett the City's proposal to <br />widen that portion of Trunk Highway 36 Service Road from that <br />intersection easterly to Fairview. Charles noted that this <br />included adding an additional lane on the north side, <br />producing a free turn movement for access west bound, <br />northerly to Perimeter Drive from Fairview Avenue. Mr. Hon- <br />chell noted that the City was attempting to get this con- <br />struction going this year, but that timing depended upon <br />cooperation from the contiguous landowners to the north <br />(Fairdale Shopping Center), relating to costs of right-of-way <br />acquisition in conjunction with appropriate assessments to <br />the land. <br />Mr. Barrett was pleased at these prospects, but also <br />��xpressed concern about the need for a signal at the inter- <br />section so as to provide more adequate egress for east bound <br />traffic heading towards Fairview f rom this intersection. <br />Mr. Honchell noted that Mr. Barrett could express his con- <br />cerns for the immediate traffic condition by writing a letter <br />requesting a review of current and future disposition. <br />3. Kraus-Anderson, 332-1241 <br />eill Harris, of Kraus-Anderson Realty, was in to discuss <br />possible de�elopment opportunities in Roseville. Kraus- <br />Anderson has two principal companies: Kraus-Anderson Can- <br />struction and Kraus-Anderson R�alty. Recently, the latter <br />has been principally occupi�d with the development of the <br />International Cent�r in downtown Minneapolis, which is in the <br />s�cond successful phase. They are, therefore, lookinq far <br />new devel4pment opportunities, and are much int�rested in <br />Ros�ville. <br />W� reviewed various locations in Rosev�lle, emphasizing the <br />tax incr�ment parcels� including those being put together by <br />Rosewood Corporation (noting their progress and intent, as <br />recently v�rified with the City Council). <br />Mr. Harris also expressed int�rest in multi-family residen- <br />tial properties, which we reviewed with him in terms of <br />�otent�al s�tes in Roseville. He agreed that he would keep <br />in �ouch with the staff, and �hat he would check into the <br />va�iou� aptions we rad discussed. <br />4. Duane Albrecht, 633-451n <br />Duane Albr�cht has begun, and substantially completed, a <br />15 ft. hy 40 ft. (600 sq. ft,) second story office addition <br />ta his site south of County Road C, between Snelling and <br />Hamline. He had not appii�d for a build�ng permit for this <br />construction and, there�ore, the �uilding was "Red Tagged". <br />
The URL can be used to link to this page
Your browser does not support the video tag.