Laserfiche WebLink
.� <br />� <br />� <br />CJ <br />Plannin Office Hours <br />g <br />November 5, 1986 <br />Page 2 <br />I talked about dedication of land, development requirements, <br />and procedures. I�uggested they hire someone to prepare a <br />site plan for early staff consideration. I am pleased that <br />these owners propose to tear down the old building which <br />would be very difficult to make work well for any good <br />reuse, because its location prevents e�ficient parking area <br />development. <br />4. Scott, 623-0153 � <br />Mike Sc�tt, attorney, was in with Robert Larson and Chris <br />Galle, develop�rs who are laoking for development possi- <br />bilities in Roseville, particularty for re�ail development. <br />I reviewed the Comprehensive Plan and Tax Increment Plan, <br />suggesting potential sites. Craig Waldron reviewed economic <br />development policy and potent�al. <br />5. Matthews, 483-3233 <br />Mark Matt�ews was in with Mary Vidas t� discuss landscape <br />plans for the development of t�� parking area on the Group W <br />site. They showed us a rather minimal plan and I sug�ested <br />that, based on our previous conversations, they were going <br />to do the mor� elaborate plan reviewed prior to th� Pla�ning <br />Commis�ion and C��ncil meetings. This was on the supposi- <br />tion tha� the drainag� cauld b� han�led by the construction <br />of a swaTe to the sou�h�ast cor��r of the site, which was <br />approved b� the City. <br />I then r��iewed the m�r� elaboxa�e plan, suggesting that it <br />be implemented by the preparation of a topographical grading <br />plan indicating the lncation, h�igh� af the bexms, a�id the <br />planting. T sugqested the berm be thre� �eet high, and that <br />the num�rous fir trees indicated s�ould be planted at four <br />feet high. I sugg�sted �he flowering cr��s �ould be reduced <br />by appxoximately one-third, inasmuch as it is the coniferous <br />planting which will be the most �ffective for screening <br />purposes. They will re�urn with a revi��d pla� for staff <br />review. <br />6, Hampton Inns, �71-6395 <br />Jam�s B�rtlett, Dave Phillips, a�d Mike Kline, the latter <br />being architects at 391-3018, were in. They are interested <br />in locating Hamgton Znn's franchises and are reviewing <br />gotential iocations in Roseville. <br />I emphasized the stra�egic advantages of the Ruan s�te, and <br />showed t�em the previously prepared Dillon Inn proposal. I <br />discuss�d other options for location, r�vie�ing the positive <br />and negativ� features. I �ncouraged them to pursue a Rose- <br />ville location, emphasizing the oth�r ancillary qualities of <br />the community. They will cor.tinue to i�vestigate and get <br />back to us in the near futur�. <br />