Laserfiche WebLink
, ` � <br />Planning Of�ice Hours � p <br />. October 29, 1986 age � <br />� The� prop�se to rent a portion of the buildin t <br />g o Apache <br />Control Systems, a wholesale distribution operation. We <br />looked into ways additional parking could be added, which <br />they f�el will be needed.. <br />4. Keenan, 571-5861 <br />Tim Keenan represents A and G Enterprises, Inc., which is <br />owned largely by the Gearman family of White Bear. They own <br />the structure originally built by Vertimag at 2715 Patton <br />Road. They purchased it in January, 1986. Rod Be��nu was the <br />leasing agent and leased about a third of the building to <br />Arrow l�oving and Storage. The land is zoned indus�rial, <br />within which "warehousing" is a permitted us�e. <br />The problem is that the way they operate this moving and <br />storage company, there appears to be a significant number of <br />trucks kept there over night and for longer periods of tin�e <br />in the parking area on the east sid� of the building. They <br />had excerised their option to buy an additi�nal sixty-six <br />foot strip of land to the �ast of th�m with the intent, as I <br />understand it, to park additional trucks on that property. <br />We informed them that this parking of trucks as a principal <br />use is not allowed, unZess a Special Use Permit is issued for <br />a trucking terminal. <br />� We discussed the City's current feasibility study to extend <br />Patton Road further to the north. Mr. Keenan agreed that <br />such a street would benefit their property, and he didn't <br />think they would oppose it. We also discussed wa�s in which <br />a new sewer connection could be made to the Roseville system <br />when Patton Road is extended. He has discussed this with <br />Charlie Honchell. The road extension may make �t easier for <br />him to connect, and therefore he would rather not connect <br />this Fall as was originally proposed and agreed upon with Mr. <br />Honchell. Charlie says the elevation of the sewer will be <br />the criteria. <br />We set a time two .�eeks from now for the staff to go over to <br />the structure to review �he operation of the storage company. <br />Dave Janisch noted that the Public Hearing for the extension <br />of Patton Road is planned for December, 1986. I noted i feel <br />the extenison af this road will be helpful to the orderly <br />de��elopment of the William Brothers Pipeline property to the <br />north, nowthat they have made a decision to sell portions of <br />that land. <br />5. Nordby, 487-3281 <br />Ken �iordby, architect, was with in John Olson of his office <br />to review pr��liminary plans they prepared for alternate ways <br />in which to expand the Legion Club in Roseville. The Club <br />• now has 6,300 square fe�t of space, and a proposed addition <br />would be approximately 7,300 square feet. They shQwed us two <br />possible alternatives. One is to build on the top of the <br />existing Club, the other is to extend it easterly. <br />