My WebLink
|
Help
|
About
|
Sign Out
Home
2016_0314_CCPacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2016
>
2016_0314_CCPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2016 3:43:58 PM
Creation date
3/10/2016 4:10:39 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />All unused curb openings along Lexington Avenue, Woodhill Drive, and Oxford <br />o <br />29 <br />Street curb line shall be removed and replaced with non- surmountable curb to <br />30 <br />match existing curbing. Curbs proposed to be replaced shall have a minimum of 3 <br />31 <br />feet of bituminous saw cut out to allow for proper compaction. <br />32 <br /> <br />Utility trenches shall be restored by the Developer per City standard plate. <br />o <br />33 <br /> <br />Sidewalk construction: The Developer shall construct all sidewalk improvements <br />34 <br />determined to be necessary by the City to serve the Property, including the construction of <br />35 <br />Americans with Disabilities Act (ADA) compliant curb ramps and sidewalks. <br />36 <br /> <br />Sidewalk facilities including curb ramps and driveway crossings, shall be <br />o <br />37 <br />constructed in accordance with City details, specifications, and the City approved <br />38 <br />Public Improvement Construction Plans. <br />39 <br /> <br />All sidewalk facilities shall be ADA compliant and meet the latest Public Rights <br />o <br />40 <br />of Way Accessibility Guide (PROWAG) requirements. <br />41 <br />All costs for the improvements will be paid by the developer. The estimated cost of construction <br />42 <br />of the public infrastructure is $106,850. The developer will provide a financial security in the <br />43 <br />amount of 125% of the estimated cost of construction ($133,562.50) in the event the developer <br />44 <br />fails to perform. <br />45 <br />The City would provide oversite on the construction. The Developer will pay the City $4,274.00 <br />46 <br />for these inspection services. <br />47 <br />The attached contract has been reviewed by the City Attorney. <br />48 <br />FI <br />INANCIAL MPLICATIONS <br />49 <br />The estimated cost of these improvements based on preliminary figures provided by the <br />50 <br />dltant is approximately $106,850.00. <br />51 <br />The contract as presented has the developer paying for all the costs of the improvement <br />52 <br />including; design, inspection, construction and city staff time related to the improvement. <br />53 <br />S <br />TAFF RECOMMENDATION <br />54 <br />Approve Cherrywood Pointe of Roseville at Lexington - Public Improvement Contract subject to <br />55 <br />approval of the Final Plat. <br />56 <br />RCA <br />EQUESTED OUNCIL CTION <br />57 <br />Approve Cherrywood Pointe of Roseville at Lexington - Public Improvement Contract subject to <br />58 <br />approval of the Final Plat. <br />59 <br />Prepared by: Jesse Freihammer, City Engineer/Asst. Public Works Director <br />Attachments: A: Public Improvement Contract <br />B: Proposed Improvement Site Plan <br /> <br /> <br />Page 2 of 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.